37
Operate the lever chain hoists (006, 007) to lift the bearing cover (004) into position on
the crank pin.
38
Put the round nuts (010) on the elastic studs.
39
Use a round bar to tighten equally the round nuts (010).
40
Measure the distance (X1, X2) between the edges of the bearing shells (002, 003) and
the bearing cover (004).
41
For new bearing shells, the dimensions X1 plus X2 must be between 1.18 mm and
1.34mm.
42
Tighten the round nuts (010), refer to section
4.2 Tighten a round nut with a pre-
X72DF
AA00-3303-03AAA-720A-A
Maintenance Manual
Connecting rod - install the bottom end bearing
Winterthur Gas & Diesel Ltd.
- 416 -
Issue 002 2020-10
Содержание X62DF
Страница 10: ...X72DF Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 002 2020 10...
Страница 165: ...X72DF Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 165 Issue 002 2020 10...
Страница 881: ...Approved Tightening Instructions Rev I Page 1 14...
Страница 882: ...Approved Tightening Instructions Rev I Page 2 14...
Страница 883: ...Approved Tightening Instructions Rev I Page 3 14...
Страница 884: ...Approved Tightening Instructions Rev I Page 4 14...
Страница 885: ...Approved Tightening Instructions Rev I Page 5 14...
Страница 886: ...Approved Tightening Instructions Rev I Page 6 14...
Страница 887: ...Approved Tightening Instructions Rev I Page 7 14...
Страница 888: ...Approved Tightening Instructions Rev I Page 8 14...
Страница 889: ...Approved Tightening Instructions Rev I Page 9 14...
Страница 890: ...Approved Tightening Instructions Rev I Page 10 14...
Страница 891: ...Approved Tightening Instructions Rev I Page 11 14...
Страница 892: ...Approved Tightening Instructions Rev I Page 12 14...
Страница 893: ...Approved Tightening Instructions Rev I Page 13 14...
Страница 894: ...Approved Tightening Instructions Rev I Page 14 14...