14.2.2
SCR - install the valve
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
2.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
Lifting tool
94815
1
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
PRELIMINARY OPERATIONS
•
The engine must be stopped.
•
If necessary, remove the SCR cover, refer to the Operation Manual.
X72DF
AA00-9270-02AAA-720A-B
Maintenance Manual
SCR - install the valve
Winterthur Gas & Diesel Ltd.
- 796 -
Issue 002 2020-10
Содержание X62DF
Страница 10: ...X72DF Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 002 2020 10...
Страница 165: ...X72DF Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 165 Issue 002 2020 10...
Страница 881: ...Approved Tightening Instructions Rev I Page 1 14...
Страница 882: ...Approved Tightening Instructions Rev I Page 2 14...
Страница 883: ...Approved Tightening Instructions Rev I Page 3 14...
Страница 884: ...Approved Tightening Instructions Rev I Page 4 14...
Страница 885: ...Approved Tightening Instructions Rev I Page 5 14...
Страница 886: ...Approved Tightening Instructions Rev I Page 6 14...
Страница 887: ...Approved Tightening Instructions Rev I Page 7 14...
Страница 888: ...Approved Tightening Instructions Rev I Page 8 14...
Страница 889: ...Approved Tightening Instructions Rev I Page 9 14...
Страница 890: ...Approved Tightening Instructions Rev I Page 10 14...
Страница 891: ...Approved Tightening Instructions Rev I Page 11 14...
Страница 892: ...Approved Tightening Instructions Rev I Page 12 14...
Страница 893: ...Approved Tightening Instructions Rev I Page 13 14...
Страница 894: ...Approved Tightening Instructions Rev I Page 14 14...