All information, illustrations and technical specifications in these operating instructions are based on the latest information available at the time of
publication. We reserve the right to make design changes at any time without prior notification.
87
8.0 Maintenance
8.9. Replace the plain bearing bushes
26. Withdraw the inside guide
(21)
from the
shaft of the central roller
27. Renew the plain bearing bushings of the
inside guide
(22)
and the roller shaft
(23)
28. Slide inside guide
(21)
onto the roller shaft
29. Push the right roller inwards
30. When mounting the bearing bolt
(20)
,
ensure that the bores are aligned
correctly.
31. Drive in clamping sleeve
(19)
to secure
32. Insert support frame on the inside
(7)
together with the bearing bolt
(6)
and
secure with screw
(4)
33. On the left-hand side, attach the inside
support frame
(7)
to the screw brackets
using the screws
(5)
.
34. Lift support box onto the roller units.
35. Mount bearing bolts
(3)
and secure with
protective screw
(2)
36. Insert the lower bearing bolts
(1)
with
tension springs
37. Adjust tension spring to previous setting
38. Lift support box together with the roller
unit, fold out parking supports and secure
39. Half shell tools (see Section 2.3.)
40. Align pressure pads with tools and attach
to the roller unit