13.1.3 Installing 2T Sensors in the Racks to Monitor
Tools required:
•
Medium, flat head screw driver to open electric panel dead front
•
Cutting tool to trim cable ties
The cooling units and rack sensors in Figure 12.9 below are symbol coded to show how interlacing sensors from different
cooling units provides redundancy and effective operation by sharing sensor data from the cooling units in Teamwork mode.
NOTE: Even though your DP Packaged Unit is located outside the conditioned area, the sensor placement still applies.
Figure 12.9 Interlacing Sensor Placement
item
Description
Item
Description
Unit 1
Cold aisle (front of racks)
Unit 2
Hot Aisle (rear of racks)
Unit 3
Supply (discharge) temperature sensor
Unit 4
Power distributrion unit
13 Hardware Installation
115
Содержание Liebert iCOM DP400/500
Страница 8: ...Vertiv Liebert iCOM Installer User Guide vi This page intentionally left blank...
Страница 64: ...Vertiv Liebert iCOM Installer User Guide 56 This page intentionally left blank...
Страница 70: ...Vertiv Liebert iCOM Installer User Guide 62 This page intentionally left blank...
Страница 86: ...Vertiv Liebert iCOM Installer User Guide 78 This page intentionally left blank...
Страница 90: ...Vertiv Liebert iCOM Installer User Guide 82 This page intentionally left blank...
Страница 110: ...Vertiv Liebert iCOM Installer User Guide 102 This page intentionally left blank...
Страница 140: ...Vertiv Liebert iCOM Installer User Guide 132 This page intentionally left blank...
Страница 178: ...Vertiv Liebert iCOM Installer User Guide 170 This page intentionally left blank...
Страница 179: ...Vertiv Liebert iCOM Installer User Guide...