Valco Cincinnati
A-1
Appendix A—Maintenance Procedures
Introduction
This appendix contains recommended daily, weekly, 3-month, 6-month, and 12-month maintenance procedures for
the MCP-25/MS system.
The maintenance procedures contained in this appendix are to be used for
cold-glue systems only. OTHERWISE, DAMAGE TO EQUIPMENT COULD
OCCUR.
Action
Date
Shift
Initials
1. Clean the exterior portion of the glue valves, nozzle
tips, glue heads, etc.
2. Purge the glue valves if necessary, and ensure proper
glue flow.
3. Ensure that air and glue pressure settings are correct.
4. If using glue inspection:
Ensure that sensor is clean. (Lens must be clean
and clear with no scratches.)
Check sensor for proper height adjustment.
Adjust for proper sensitivity if necessary.
Daily Maintenance
Содержание MCP-25/MS
Страница 1: ...MCP 25 MS Control Manual Number MC051 Release Date June 2004 ...
Страница 25: ......
Страница 27: ......
Страница 28: ......
Страница 29: ...3 4 5 1 2 2 4 5 3 1 ...
Страница 30: ......
Страница 31: ......
Страница 33: ...4 8 12 11 10 9 6 7 5 3 2 1 ...
Страница 34: ...3 7 9 10 8 5 6 4 1 2 1 4 3 2 ...
Страница 35: ...1 3 4 2 ...
Страница 36: ...7 9 10 8 3 5 6 4 1 2 ...
Страница 37: ...SHD NPN 5 4 3 24V Low Level Detector 0V 1 2 ...
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ...3 4 5 6 2 3 1 5 6 4 1 2 ...
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ...RODUCT 7 10 9 8 3 5 6 4 1 2 8 10 9 2 5 7 6 3 4 1 ...
Страница 50: ......
Страница 51: ......
Страница 52: ...6 8 10 9 7 1 3 5 4 2 ...
Страница 53: ......
Страница 54: ......
Страница 55: ...6 8 10 9 7 1 3 5 4 2 ...
Страница 56: ...VA LC O CI NCIN NA TI INC 513 87 4 6550 5 13 87 4 6550 VALC O C INCIN NATI INC ...
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 87: ......
Страница 99: ...F1 F2 F3 F4 F5 ...