Chapter 4
PXNplus CPU board
39
Downstream configuration jumper - J9
Inserting and removing the PXNplus board
Inserting the PXNplus board
1. Disconnect power and battery backup power.
Note:
When re-inserting the CPU board, the RS-485 J8 connector MUST be connected at all times to comply
with CE requirements for use in the European Union. See
Figure 75
on page 145.
2. Insert the CPU board into the controller.
3. Attach any necessary cables.
Removing the PXNplus board
1. To safely shut down the controller operating system, short JP3 for approximately 5 seconds until DS7
turns on. DS2 and DS3 then alternate On.
2. Disconnect power and battery backup power.
3. Remove any connected cables.
4. Carefully remove the CPU board from the controller.
Table 13. Downstream configuration jumper
J9
Pins
Function
1 and 2
1
1.
This is the default setting. If the jumper is missing, the default setting is used.
RS-232 using J4 on Power/Communications board
RS-422 using J2 on the Power/Communications board
2 and 3
Reserved - Do not use.
3 and 4
Reserved - Do not use.
CAUTION:
Earlier lines of controllers sometimes required the “wrap plug” to force the controller into maintenance
mode. DO NOT use the wrap plug on the PXNplus CPU board. To properly set the controller into
maintenance mode, short JP3 (Shutdown Request) for about 5 seconds until DS8 turns on. DS2 and
DS3 will then alternate ON and OFF.
CAUTION:
Follow standard static prevention procedures. See
Electrostatic Discharge (ESD) precaution
on page 9
CAUTION:
Follow standard static prevention procedures. See
Electrostatic Discharge (ESD) precaution
on
page 9.
Содержание M3000
Страница 1: ...M3000 Installation Manual P N 460630001H 15JUNE11 ...
Страница 10: ...M3000 Installation Manual x ...
Страница 37: ...Chapter 3 Power Communications board 27 Host computer wiring Figure 9 Wiring host computer to first M3000 ...
Страница 39: ...Chapter 3 Power Communications board 29 Figure 11 Wiring modem to M3000 M 5 or serial printer ...
Страница 41: ...Chapter 3 Power Communications board 31 Figure 13 Wiring downstream away from the host using RS 232 ...
Страница 47: ...Chapter 4 PXNplus CPU board 37 Board layout Figure 16 PXNplus CPU board layout ...
Страница 58: ...M3000 Installation Manual 48 Board layout Figure 17 2RP reader board layout ...
Страница 65: ...Chapter 5 Reader processing boards 55 Figure 21 Wiring 2RP to Wiegand Strobed F 2F and supervised F 2F readers ...
Страница 68: ...M3000 Installation Manual 58 Figure 24 Wiring 2RP door strike external relay ...
Страница 72: ...M3000 Installation Manual 62 Board layout Figure 27 2SRP supervised reader board layout ...
Страница 78: ...M3000 Installation Manual 68 Figure 30 Wiring 2SRP to Wiegand F 2F Strobed and Supervised F 2F Readers ...
Страница 82: ...M3000 Installation Manual 72 Figure 19 Wiring 2SRP door alarm contact and exit request ...
Страница 84: ...M3000 Installation Manual 74 Figure 21 Wiring 2SRP door strike external relay ...
Страница 89: ...Chapter 5 Reader processing boards 79 Board layout Figure 24 8RP reader board layout ...
Страница 92: ...M3000 Installation Manual 82 Figure 26 Wiring 8RP to F 2F or Supervised F 2F Readers ...
Страница 94: ...M3000 Installation Manual 84 ...
Страница 97: ...Chapter 6 Optional DI and DO boards 87 Figure 31 20DI board layout ...
Страница 99: ...Chapter 6 Optional DI and DO boards 89 Figure 32 Wiring DI point ...
Страница 101: ...Chapter 6 Optional DI and DO boards 91 Figure 33 16DO board layout ...
Страница 102: ...M3000 Installation Manual 92 Figure 34 16DOR board layout ...
Страница 104: ...M3000 Installation Manual 94 Figure 36 Wiring output device to 16DOR board ...
Страница 152: ...M3000 Installation Manual 142 ...
Страница 156: ...M5 controller Installation Manual 146 Figure 76 Installing ferrite ...
Страница 160: ...M5 controller Installation Manual 150 ...
Страница 172: ...M3000 Installation Manual 162 ...