66
RT-SVX24Q-EN
well as damage the gas valve. Oversizing the
regulator will cause irregular pulsating flame
patterns, burner rumble, potential flame outages,
and possible gas valve damage.
If a single pressure regulator serves more than one
rooftop unit, it must be sized to ensure that the inlet
gas pressure does not fall below 7" w.c. with all the
furnaces operating at full capacity. The gas
pressure must not exceed 14" w.c. when the
furnaces are off.
7. Provide adequate support for all field installed gas
piping to avoid stressing the gas train and controls.
W
WA
AR
RN
NIIN
NG
G
E
Ex
xp
pllo
ossiio
on
n H
Ha
azza
arrd
d!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w ssa
affe
e lle
ea
akk tte
esstt p
prro
occe
ed
du
urre
ess b
be
ello
ow
w
cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y o
orr
e
eq
qu
uiip
pm
me
en
ntt o
orr p
prro
op
pe
errtty
y--o
on
nlly
y--d
da
am
ma
ag
ge
e..
N
Ne
ev
ve
err u
usse
e a
an
n o
op
pe
en
n fflla
am
me
e tto
o d
de
ette
ecctt g
ga
ass lle
ea
akkss.. U
Usse
e a
a
lle
ea
akk tte
esstt sso
ollu
uttiio
on
n ffo
orr lle
ea
akk tte
essttiin
ng
g..
8. Leak test the gas supply line using a soap-and-
water solution or equivalent before connecting it to
the gas train.
9. Check the supply pressure before connecting it to
the unit to prevent possible gas valve damage and
the unsafe operating conditions that will result.
N
No
otte
e:: Do not rely on the gas train shutoff valves to
isolate the unit while conducting gas
pressure/leak test. These valves are not
designed to withstand pressures in excess of
14" w.c. or 0.5 psig.
Connecting the Gas Supply Line to the
Furnace Gas Train
Follow the steps below to complete the installation
between the supply gas line and the furnace. Refer to
and
, for the
appropriate gas train configuration.
1. Connect the supply gas piping using a “ground-
joint” type union to the furnace gas train and check
for leaks.
2. Adjust the inlet supply pressure to the
recommended 7" to 14" w.c. parameter for natural
gas.
3. Ensure that the piping is adequately supported to
avoid gas train stress.
4. If the through the base gas opening is used, seal off
around the pipe and the 3" water dam. If the
through the base gas opening is not used, the 3"
opening should be sealed shut to prevent indoor air
leakage.
Table 23.
Sizing natural gas pipe mains and branches
Gas SupplyPipe Run
(ft)
Gas Input (Cubic Feet/Hour)
1¼" Pipe
1½" Pipe
2" Pipe
2½" Pipe
3" Pipe
4" Pipe
10
1,060
1,580
3,050
4,860
8,580
17,500
20
726
1,090
2,090
3,340
5,900
12,000
30
583
873
1,680
2,680
4,740
9,660
40
499
747
1,440
2,290
4,050
8,270
50
442
662
1,280
2,030
3,590
7,330
60
400
600
1,160
1,840
3,260
6,640
70
368
552
1,060
1,690
3,000
6,110
80
343
514
989
1,580
2,790
5,680
90
322
482
928
1,480
2,610
5,330
100
304
455
877
1,400
2,470
5,040
125
269
403
777
1,240
2,190
4,460
150
244
366
704
1,120
1,980
4,050
175
224
336
648
1,030
1,820
3,720
Содержание IntelliPak 2 Series
Страница 217: ...RT SVX24Q EN 217 N No ot te es s...
Страница 218: ...218 RT SVX24Q EN N No ot te es s...
Страница 219: ...RT SVX24Q EN 219 N No ot te es s...