176
RT-SVX24Q-EN
Table 61.
eFlex™ staging sequence and compressor data (continued)
150 Ton eFlex™ Variable Speed Compressor
Stage
1A CSHN250
1B CSHN184
1C CSHN374
2A VZH170
2B CSHN374
VZH min
Speed
VZH max
Speed
1
X
3360
5280
2
X
X
1500
6000
3
X
X
X
1620
5000
4
X
X
X
1800
6000
5
X
X
X
X
1500
5280
6
X
X
X
X
1500
6000
7
X
X
X
X
X
1500
6000
Evaporative Condenser Startup
IIm
mp
po
orrtta
an
ntt:: Water treatment by a qualified water
treatment expert is required to ensure
proper equipment life and product
performance. If a water treatment system is
not operating on the unit, do not proceed.
Startup for evaporative and air-cooled condensers is
initially the same. In addition, the following is required
for evaporative condensers prior to startup:
•
All water and drain connections must be checked
and verified
•
Evaporative condensers will ship with a fan support
channel to reduce damage caused by vibration
during shipment. The shipping support brackets
must be removed prior to unit startup. See below
and see
for removal instructions.
•
Verify that inlet water pressure is 35-60 PSIG,
dynamic pressure (measured with the valve open)
•
Verify that drain valve is set to "drain during power
loss" or "hold during power loss" per job
specification
•
Upon a call for cooling, the sump will fill with water.
Verify that the sump fills to a level within the slot on
the max float bracket as shown in
T
To
o rre
em
mo
ov
ve
e ssh
hiip
pp
piin
ng
g b
brra
acckke
ettss::
IIm
mp
po
orrtta
an
ntt:: Remove fan shipping brackets before
startup. Failure to remove brackets could
result in fan damage.
Evaporative condensers are shipped with fan shipping
brackets to reduce damage caused by vibration during
shipment. The fan shipping brackets must be removed
prior to unit startup. To remove the shipping brackets
start from the side opposite to the drain actuator:
1. Loosen the screw for the bracket that holds the inlet
louvers below the door side.
2.
Remove inlet louvers and set to the side.
N
No
otte
e:: Service technician may need to step on the
horizontal surface of FRP coated base. Step
with care.
3.
Unscrew the bolt in the middle of the door. Keep
the bolt in a safe place.
4.
Lift one door with handle until it touches the top.
Swivel bottom of door to remove it from the door
opening and set it to the side.
5.
Slide and remove the middle mist eliminator
section so that the shipping bracket is visible.
6.
Use screw gun to unscrew the two screws that hold
the fan shipping bracket. The bracket should drop
down but still remain engaged with a hook on the
bracket.
7. Go to the other side of the unit and follow the
procedure for inlet louver and door removal
(see steps 1 - 6).
8. Hold the bracket with one hand and remove
remaining two screws.
9. Remove the bracket and all the removed screws
from the unit.
IIm
mp
po
orrtta
an
ntt:: Make sure there are no screws
remaining in the coil area.
10. Reinstall inlet louvers, mist eliminators and louvers.
11. Check that the direction of arrow on the inlet louver
is correct
Содержание IntelliPak 2 Series
Страница 217: ...RT SVX24Q EN 217 N No ot te es s...
Страница 218: ...218 RT SVX24Q EN N No ot te es s...
Страница 219: ...RT SVX24Q EN 219 N No ot te es s...