RT-SVX24Q-EN
measure and record the preliminary amount of R-
410A added to each circuit.
12. With all the circuit compressors operating, SLOWLY
meter R410-A into the suction line from the LIQUID
charging connection.
Evaporative Condenser Tubing Connection
IIm
mp
po
orrtta
an
ntt::
•
For units with electric heat, complete
tubing connections AFTER completing
wiring connections. See
.
•
Complete tubing connections BEFORE
Power and Control wiring connections.
See
.
There will be a N
2
nitrogen charge in the air handler
section. This holding charge should be relieved prior to
removing the caps.
The condenser section will ship with R-410A
throughout the entire tubing assemblies. The service
valves will be shipped in an open position. Additional
interconnecting tubes (approx. 15-20" in length) will be
supplied with the unit.
1. To prepare the condensing section for the joining of
the two sections, the discharge line service valves
should be shut and the refrigerant remaining
between the valves and the end caps should be
transferred/recovered.
2. If the unit has been purchased with hot gas bypass
or hot gas reheat options, those valves should be
shut as well and the refrigerant transferred/
recovered from the sections between the valves
and the end caps.
3. Remove the brackets which support the suction
tubes (retain for possible use later for unit
reassembly) after the tubing connections are
complete.
4. Relieve the pressure (charge) for the section of the
tubing being worked on.
5. Place wet rags on the flow/ ball valve on the high
side when suction tubes are being brazed.
N
No
otte
e:: Additional care should be taken when
brazing near the wire bundle.
W
WA
AR
RN
NIIN
NG
G
E
Ex
xp
pllo
ossiio
on
n H
Ha
azza
arrd
d a
an
nd
d D
De
ea
ad
dlly
y G
Ga
asse
ess!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w a
allll p
prro
op
pe
err ssa
affe
e rre
effrriig
ge
erra
an
ntt
h
ha
an
nd
dlliin
ng
g p
prra
accttiicce
ess cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss
iin
njju
urry
y..
N
Ne
ev
ve
err sso
olld
de
err,, b
brra
azze
e o
orr w
we
elld
d o
on
n rre
effrriig
ge
erra
an
ntt lliin
ne
ess o
orr
a
an
ny
y u
un
niitt cco
om
mp
po
on
ne
en
nttss tth
ha
att a
arre
e a
ab
bo
ov
ve
e a
attm
mo
ossp
ph
he
erriicc
p
prre
essssu
urre
e o
orr w
wh
he
erre
e rre
effrriig
ge
erra
an
ntt m
ma
ay
y b
be
e p
prre
esse
en
ntt..
A
Allw
wa
ay
yss rre
em
mo
ov
ve
e rre
effrriig
ge
erra
an
ntt b
by
y ffo
ollllo
ow
wiin
ng
g tth
he
e
g
gu
uiid
de
elliin
ne
ess e
esstta
ab
blliissh
he
ed
d b
by
y tth
he
e E
EP
PA
A F
Fe
ed
de
erra
all C
Clle
ea
an
n
A
Aiirr A
Acctt o
orr o
otth
he
err sstta
atte
e o
orr llo
occa
all cco
od
de
ess a
ass a
ap
pp
prro
op
prriia
atte
e..
A
Afftte
err rre
effrriig
ge
erra
an
ntt rre
em
mo
ov
va
all,, u
usse
e d
drry
y n
niittrro
og
ge
en
n tto
o
b
brriin
ng
g ssy
ysstte
em
m b
ba
acckk tto
o a
attm
mo
ossp
ph
he
erriicc p
prre
essssu
urre
e b
be
effo
orre
e
o
op
pe
en
niin
ng
g ssy
ysstte
em
m ffo
orr rre
ep
pa
aiirrss.. M
Miix
xttu
urre
ess o
off
rre
effrriig
ge
erra
an
nttss a
an
nd
d a
aiirr u
un
nd
de
err p
prre
essssu
urre
e m
ma
ay
y b
be
ecco
om
me
e
cco
om
mb
bu
ussttiib
blle
e iin
n tth
he
e p
prre
esse
en
ncce
e o
off a
an
n iig
gn
niittiio
on
n sso
ou
urrcce
e
lle
ea
ad
diin
ng
g tto
o a
an
n e
ex
xp
pllo
ossiio
on
n.. E
Ex
xcce
essssiiv
ve
e h
he
ea
att ffrro
om
m
sso
olld
de
erriin
ng
g,, b
brra
azziin
ng
g o
orr w
we
elld
diin
ng
g w
wiitth
h rre
effrriig
ge
erra
an
ntt
v
va
ap
po
orrss p
prre
esse
en
ntt cca
an
n ffo
orrm
m h
hiig
gh
hlly
y tto
ox
xiicc g
ga
asse
ess a
an
nd
d
e
ex
xttrre
em
me
elly
y cco
orrrro
ossiiv
ve
e a
acciid
dss..
6. Sweat the copper caps off both the high and low
side of the suction and liquid lines of both circuits.
7. Clean the joints of weld puddles to avoid insertion
problems.
8. Cut the appropriate interconnecting tube to a length
approximately 0.75"- 1" more than the distance
between the two tubes.
9. Insert the appropriate tube to the complete depth of
the bell on one side of the joint and align the other
side (prying the high side may be needed). Make
sure the insertion depth is met.
10. Complete the connections by brazing the tubes in
place.
N
No
otte
e:: Refrigeration ball valves are intended for
general service and are not a positive shutoff
device.
11. Once all connections have been brazed, evacuate
the low side. The low side may be evacuated by the
schrader ports on the discharge line just past the
compressor and the liquid line below the sight
glass. See
The recommended method for evacuation and
dehydration is to evacuate the low side to 500
microns or less. To establish that the unit is leak-
free, use a standing vacuum test. The maximum
allowable rise over a 15 minute period is 200
microns. If the rise exceeds this, there is either still
moisture in the system or a leak is present.
N
No
otte
e:: Only after evacuation should the tagged
valves be opened.