RT-SVX24Q-EN
69
Table 27.
Gas heat piping penetration measurements
Tons
Energy
Recovery
Wheel
(ERW)
Pieces
Heat
(MBH)
Gas Flue
Condensate
Drain Outlet
Gas Connection,
Horizontal
Gas Connection,
Base
Horizontal Distance
Mist Elim to Flue
C/L
Unit End to Hole
C/L
Unit End to Hole
C/L
K
C
H
B
90-118
No ERW
1 & 2 Pc
1800
160 1/16
254 14/16
266 4/16
274 11/16
90-118
No ERW
1 & 2 Pc
1100
159 15/16
263 15/16
265 5/16
274 11/16
90-118
No ERW
1 & 2 Pc
850
159 15/16
263 15/16
265 5/16
274 11/16
120-162
No ERW
1 & 2 Pc
2500
214 11/16
321
337 7/16
339 7/16
120-162
No ERW
1 & 2 Pc
1800
214 13/16
319 11/16
331
339 7/16
120-162
No ERW
1 & 2 Pc
1100
214 11/16
327 14/16
330 1/16
339 7/16
90-118
ERW
1 & 2 Pc
1800
164 11/16
351 5/16
362 10/16
371 1/16
90-118
ERW
1 & 2 Pc
1100
164 8/16
360 6/16
361 12/16
371 1/16
90-118
ERW
1 & 2 Pc
850
164 8/16
360 6/16
361 12/16
371 1/16
120-162
ERW
1 & 2 Pc
2500
219 13/16
417 7/16
433 14/16
435 14/16
120-162
ERW
1 & 2 Pc
1800
220
416 2/16
427 7/16
435 14/16
120-162
ERW
1 & 2 Pc
1100
219 13/16
424 5/16
426 8/16
435 14/16
90-118
No ERW
3 Pc
1800
179 6/16
274 3/16
285 8/16
293 15/16
90-118
No ERW
3 Pc
1100
179 3/16
283 3/16
284 9/16
293 15/16
90-118
No ERW
3 Pc
850
179 3/16
283 3/16
284 9/16
293 15/16
120-162
No ERW
3 Pc
2500
240 2/16
346 8/16
362 15/16
364 15/16
120-162
No ERW
3 Pc
1800
240 5/16
345 3/16
356 8/16
364 15/16
120-162
No ERW
3 Pc
1100
240 2/16
353 6/16
355 9/16
364 15/16
90-118
ERW
3 Pc
1800
183 15/16
376 13/16
388 2/16
390 6/16
90-118
ERW
3 Pc
1100
183 13/16
385 13/16
387 3/16
390 6/16
90-118
ERW
3 Pc
850
183 13/16
385 13/16
387 3/16
390 6/16
120-162
ERW
3 Pc
2500
245 5/16
442 15/16
459 6/16
461 6/16
120-162
ERW
3 Pc
1800
245 8/16
441 9/16
452 15/16
461 6/16
120-162
ERW
3 Pc
1100
245 5/16
449 12/16
452
461 6/16
General Coil Piping and Connection
Recommendations
Proper installation, piping, and trapping is necessary to
ensure satisfactory coil operation and to prevent
operational damage:
N
No
otte
e:: The contractor is responsible for supplying the
installation hardware.
☐
Support all piping independently of the coils.
☐
Provide swing joints or flexible fittings on all
connections that are adjacent to heating coils to
absorb thermal expansion and contraction strains.
☐
Install factory supplied control valves (valves ship
separately).
N
NO
OT
TIIC
CE
E
C
Co
on
nn
ne
eccttiio
on
n L
Le
ea
akkss!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d
rre
essu
ulltt iin
n d
da
am
ma
ag
ge
e tto
o tth
he
e cco
oiill h
he
ea
ad
de
err a
an
nd
d cca
au
usse
e
cco
on
nn
ne
eccttiio
on
n lle
ea
akkss..
U
Usse
e a
a b
ba
acckku
up
p w
wrre
en
ncch
h w
wh
he
en
n a
atttta
acch
hiin
ng
g p
piip
piin
ng
g tto
o
cco
oiillss w
wiitth
h cco
op
pp
pe
err h
he
ea
ad
de
errss.. D
Do
o n
no
ott u
usse
e b
brra
assss
cco
on
nn
ne
ecctto
orrss b
be
ecca
au
usse
e tth
he
ey
y d
diisstto
orrtt e
ea
assiilly
y..
Содержание IntelliPak 2 Series
Страница 217: ...RT SVX24Q EN 217 N No ot te es s...
Страница 218: ...218 RT SVX24Q EN N No ot te es s...
Страница 219: ...RT SVX24Q EN 219 N No ot te es s...