7
•
Maintenance and Service
Fluorescence Detectors (VC-D50, VC-D51, VF-D50, VF-D51)
Operating Manual
Page 147
4. Remove the flow cell from the device and store it in its packaging.
Ensure that you install the flow cell cover to the flow cell opening.
Flow cells must be shipped in their original packaging.
NOTICE
The flow cell opening on the device is sensitive to dust and debris.
If no flow cell is installed to the device, close the flow cell opening with
the cover for the flow cell opening.
5. Remove the device or slide-in module from the system stack as
required:
Install the carrying handles and remove the device from the
Vanquish system. Follow the instructions on dismounting the system
stack in the
Transporting or Shipping the System
section of the
Vanquish System Operating Manual
.
‑or‑
Remove the slide-in module from the device enclosure in the system
stack (see
Removing the Slide-In Module (
).
See also
2
7.11.2 Transporting the Device to a New Location
Preparations
Prepare the device for transport. See
Preparing the Device for Transport
Follow these steps
1. Observe the notes for handling and lifting the device safely.
2. Transport the device to the new location.
3. Install and set up the device in the system stack. Follow the
instructions on mounting the system stack in the
Vanquish System
Operating Manual
.
4. Set up the device:
a) Connect the device and set up flow connections (see
b) Prepare the device for operation (see
5. Before starting an analysis, let the device equilibrate and be sure
that it is ready for operation.
Содержание Vanquish VC-D50
Страница 4: ...Contacting Us Page 4 Fluorescence Detectors VC D50 VC D51 VF D50 VF D51 Operating Manual...
Страница 10: ...Contents Page 10 Fluorescence Detectors VC D50 VC D51 VF D50 VF D51 Operating Manual...
Страница 30: ...2 Safety Page 30 Fluorescence Detectors VC D50 VC D51 VF D50 VF D51 Operating Manual...
Страница 42: ...3 Device Overview Page 42 Fluorescence Detectors VC D50 VC D51 VF D50 VF D51 Operating Manual...
Страница 88: ...5 Installation Page 88 Fluorescence Detectors VC D50 VC D51 VF D50 VF D51 Operating Manual...
Страница 122: ...6 Operation Page 122 Fluorescence Detectors VC D50 VC D51 VF D50 VF D51 Operating Manual...
Страница 154: ...7 Maintenance and Service Page 154 Fluorescence Detectors VC D50 VC D51 VF D50 VF D51 Operating Manual...
Страница 170: ...9 Specifications Page 170 Fluorescence Detectors VC D50 VC D51 VF D50 VF D51 Operating Manual...
Страница 187: ...Index Fluorescence Detectors VC D50 VC D51 VF D50 VF D51 Operating Manual Page 187...
Страница 188: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com...