
Installation
Unpacking and Inspection
2-2
Model 49
i
Primary Standard Instruction Manual
Thermo Fisher Scientific
3. Remove the packing material (
Figure 2-1.
Remove the Packing Material
4. Remove the three shipping screws (
).
Figure 2-2.
Remove the Shipping Screws
5. Check for possible damage during shipment.
6. Check that all connectors and circuit boards are firmly attached.
Units without Optional I/O Board
Units with Optional I/O Board
Remove Packing
Remove Packing
(2 pieces)
(2 pieces)
Shipping Screws (3)
Содержание 49i
Страница 4: ......
Страница 12: ...Figures xii Model 49i Primary Standard Instruction Manual Thermo Fisher Scientific ...
Страница 146: ...Troubleshooting Service Locations 5 22 Model 49i Primary Standard Instruction Manual Thermo Fisher Scientific ...
Страница 203: ...Thermo Fisher Scientific Model 49i Primary Standard Instruction Manual 8 5 Figure 8 2 Bench Mounting ...
Страница 204: ...8 6 Model 49i Primary Standard Instruction Manual Thermo Fisher Scientific Figure 8 3 EIA Rack Mounting ...
Страница 205: ...Thermo Fisher Scientific Model 49i Primary Standard Instruction Manual 8 7 Figure 8 4 Retrofit Rack Mounting ...
Страница 206: ...Optional Equipment Mounting Options 8 8 Model 49i Primary Standard Instruction Manual Thermo Fisher Scientific ...