
Preventive Maintenance
Leak Test and Pump Checkout
Thermo Fisher Scientific
Model 49
i
Primary Standard Instruction Manual
4-7
3. Remove the four screws from the top plate, remove top plate, flapper
valve, and the bottom plate.
Figure 4-2.
Rebuilding the Pump
4. Remove the screw the securing the diaphragm to piston and remove
diaphragm.
5. Assemble the pump by following the previous steps in reverse, make
sure the Teflon® (white) side of the diaphragm is facing up and that the
flapper valves cover the holes of the top and bottom plate.
6. Perform the “Leak Test and Pump Checkout” procedure described in
this chapter.
Leak Test and Pump
Checkout
Use the following procedures to test for system leaks and checkout the
pump.
External Leaks
Use the following procedure to test for leaks around the fittings.
Top Plate
Flapper Plate
Bottom Plate
Diaphragm
Содержание 49i
Страница 4: ......
Страница 12: ...Figures xii Model 49i Primary Standard Instruction Manual Thermo Fisher Scientific ...
Страница 146: ...Troubleshooting Service Locations 5 22 Model 49i Primary Standard Instruction Manual Thermo Fisher Scientific ...
Страница 203: ...Thermo Fisher Scientific Model 49i Primary Standard Instruction Manual 8 5 Figure 8 2 Bench Mounting ...
Страница 204: ...8 6 Model 49i Primary Standard Instruction Manual Thermo Fisher Scientific Figure 8 3 EIA Rack Mounting ...
Страница 205: ...Thermo Fisher Scientific Model 49i Primary Standard Instruction Manual 8 7 Figure 8 4 Retrofit Rack Mounting ...
Страница 206: ...Optional Equipment Mounting Options 8 8 Model 49i Primary Standard Instruction Manual Thermo Fisher Scientific ...