D 13373.08
NOVEMBER 2007
MPS
Installation
TANDBERG
MPS
ADMINISTRATOR GUIDE
Precautions
Unpacking
To avoid damage to the unit during transportation, the TANDBERG MPS is
delivered in a special shipping box.
The shipping box contains the following components:
Chassis:
1.
MPS 200, a 3U chassis with power supply.
a.
or MPS 800, a 9U chassis with 2 or 3 x Power Units (depending on
b.
the number of Media Processing Boards installed)
1 x System Controller Board
c.
The Media Processing Boards ordered
d.
PRI E1/T1 ISDN Interface Card (if ordered)
e.
V.35 Serial Interface Card (if ordered)
f.
Administrator Guide and other documentation on CD
2.
Installation sheets
3.
4 screws and 4 nuts for rack mounting and 4 pads
4.
Cables:
5.
Power cable
a.
Ethernet cables
b.
ISDN cables (optional)
c.
V.35 kit (optional). The kit includes cables that convert from high-
d.
density connectors on V.35 card to TANDBERG’s standard V.35
connectors (26pin DSUB) and 19” rack-mountable panel where the
V.35 connectors will fit.
RJ45 to RS-232 converter cable
e.
What is in the Box?
Please read carefully:
Never install communication equipment dur-
•
ing a lightning storm.
Never install jacks for communication
•
cables in wet locations unless the jack is
specifically designed for wet locations.
Never touch uninstalled communication
•
wires or terminals unless the communication
line has been disconnected at the network
interface.
Use caution when installing or modifying com-
•
munication lines.
Avoid using communication equipment (other
•
than a cordless type) during an electrical
storm. There may be a remote risk of electri-
cal shock from lightning.
Do not use communication equipment to
•
report a gas leak in the vicinity of the leak.
The socket outlet shall be installed near the
•
equipment and shall be easily accessible.
Never install cables without first switching
•
the power OFF.
This product complies with directives: LVD
•
73/23/EC and EMC 89/366/EEC.
Caution - Double pole fusing.
•
Power must be switched off before power
•
supplies can be removed from or installed
into the unit.
Mounting the MPS on a Rack
The TANDBERG MPS comes with 4 screws and 4 nuts for mounting in
standard 19” racks. The chassis is equipped with brackets.
Before starting the rack mounting, please make sure the TAND-
1.
BERG MPS is placed securely on a hard, flat surface.
Disconnect the AC power cable.
2.
Make sure that the mounting space is according to the
3.
Prepara-
tions on Site
in the section above.
Insert the chassis into a 19” rack, and secure with screws in the
4.
front (four screws) and nuts (four nuts).
Rack Mounting
Preparations on Site
The mounting space must be prepared before you start:
Make sure the TANDBERG MPS is accessible and that all cables
•
can be easily connected
For ventilation: Leave a space of at least 10cm (4 inches) behind
•
the TANDBERG MPS’s rear panel and 10cm (4 inches) in front of
the front panel
The room in which you install the TANDBERG MPS should have an
•
ambient temperature between 0ºC and 35ºC (32ºF and 95ºF) and
between 10% and 90% non-condensing relative humidity
Do not place heavy objects directly on top of the TANDBERG MPS
•
Do not place hot objects directly on top, or directly beneath the
•
TANDBERG MPS
Use a grounded AC power outlet for the TANDBERG MPS.
•
Precautions, Unpacking and Mounting
20
Introduction
Quick
Setup
Using
the MPS
System
Status
System
Configuration
Gateway
Configuration
MCU
Configuration
Technical
Descriptions
Appendices
Main
Installation