5
Performance Checks
Test Procedures
5-29
Shift Amplitude: 2 V
Baud Rate:
10 kHz
Sync: On
Output: On
5. Using ArbConnection, prepare and download 10-step ASK list
with alternating “0” and “1”
Test Procedure:
1. Verify ASK operation on the oscilloscope as follows:
Waveform: Sinewave
Period: 0.1
ms
Amplitude:
Every 0.1 ms alternates between 2 and 4 V
Test Results
Pass
Fail
Variable Dwell Time
Frequency Hops
Equipment: Oscilloscope
Preparation:
1. Configure the oscilloscope as follows:
Time Base:
0.5 ms
Sampling Rate: 50 MS/s at least.
Trace A View:
Jitter, Type: FREQ, CLK.
Trigger source: Channel 2, positive slope
Amplitude:
1 V/div
2. Connect the 5251 output to the oscilloscope input, channel 1
3. Connect the 5251 SYNC to the oscilloscope input, channel 2
4. Configure model 5251 controls as follows:
Waveform:
Modulated
Modulation:
Hop
Hop Mode:
Variable
Sync: On
Output: On
5. Using ArbConnection prepare, open the Hop Table composer
and download the following table (both channels):
Frequency Dwell
Time
1.0e6 50e-6
1.2e6 100e-6
1.4e6 150e-6
1.6e6 200e-6
1.8e6 250e-6
2.0e6 300e-6
2.2e6 350e-6
2.4e6 400e-6
2.6e6 450e-6
2.8e6 500e-6
Содержание 5251
Страница 17: ...List of Figures continued xiv...
Страница 35: ...TE5251 User Manual 1 18 This page was intentionally left blank...
Страница 37: ...TE5251 User Manual 2 2...
Страница 134: ...TE5251 User Manual 3 82 Figure 3 62 Log File Example...
Страница 222: ...TE5251 User Manual 4 88 This page was left intentionally blank...
Страница 258: ...TE5251 User Manual 5 36 This page was intentionally left blank...
Страница 288: ...TE5251 User Manual 6 30 This page was intentionally left blank...
Страница 289: ...1 Appendices Appendix Title Page A Specifications A 1...
Страница 290: ...TE5251 User Manual 2...