3-34 ENGINE
• Compress the valve spring with the special tools.
09916-14510: Valve lifter
09916-14910: Valve lifter attachment
09916-84511: Tweezer
• Install the valve cotter halves
3
.
NOTE:
To facilitate assembly, apply a little grease to the valve cotter
when fitting into the valve stem groove.
INTAKE PIPE
• Apply grease to the O-ring.
99000-25010: SUZUKI SUPER GREASE “A”
or equivalent
• Install the intake pipe with “UP” mark
A
faced upward.
CAM CHAIN TENSIONER
• Install the cam chain tensioner
1
and gasket.
• Tighten the cam chain tensioner bolt
2
to the specified
torque.
Cam chain tensioner bolt: 10 N·m (1.0 kgf-m, 7.0 lbf-ft)
Compressing of the valve spring must be limited to the
extent only necessary to prevent the spring from
fatigue.
Check that the rounded lip
D
of the cotter is securely
fitted in the groove
E
in the valve stem end.
Use the new O-ring to prevent sucking air from the
joint.
Содержание TU250X
Страница 1: ......
Страница 2: ......
Страница 41: ...PERIODIC MAINTENANCE 2 23...
Страница 213: ...EXHAUST SYSTEM 6 1 6 EXHAUST SYSTEM CONTENTS EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 4 INSTALLATION 6 4...
Страница 342: ...10 22 SERVICING INFORMATION SIDE STAND INSTALLATION 50 N m 5 0 kgf m 36 0 lbf ft 55 N m 5 5 kgf m 40 0 lbf ft...
Страница 369: ......
Страница 370: ......