ENGINE 3-67
• Install the generator cover
2
and tighten the generator cover
bolts to the specified torque.
Generator cover bolt (M6): 11 N·m (1.1 kgf-m, 8.0 lbf-ft)
Generator cover bolt (M5): 6 N·m (0.6 kgf-m, 4.5 lbf-ft)
NEUTRAL SWITCH
• Install the springs
1
and switch contacts
2
.
• Apply grease to the O-ring
3
and install it.
99000-25010: SUZUKI SUPER GREASE “A”
or equivalent
• Install the neutral switch
4
.
PISTON RING
• Install the piston rings in the order of oil ring, 2nd ring and 1st
ring.
• To install the oil ring, fit the spacer
1
first and then the side
rails
2
.
Replace the O-ring with a new one.
* Do not remove the wire
3
from the spacer
1
.
* When installing the piston rings, be careful not to
damage the piston.
* Do not expand the piston ring excessively since it is
apt to be broken down.
Содержание TU250X
Страница 1: ......
Страница 2: ......
Страница 41: ...PERIODIC MAINTENANCE 2 23...
Страница 213: ...EXHAUST SYSTEM 6 1 6 EXHAUST SYSTEM CONTENTS EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 4 INSTALLATION 6 4...
Страница 342: ...10 22 SERVICING INFORMATION SIDE STAND INSTALLATION 50 N m 5 0 kgf m 36 0 lbf ft 55 N m 5 5 kgf m 40 0 lbf ft...
Страница 369: ......
Страница 370: ......