CHASSIS 8-7
• Remove the wheel bearings
1
with the special tool.
09941-50111: Wheel bearing remover set
• Remove the spacer
2
.
FRONT AXLE
Measure the front axle runout using the dial gauge.
If the runout exceeds the service limit, replace the front axle with
a new one.
Axle shaft runout
Service Limit: 0.25 mm (0.010 in)
09900-20607: Dial gauge
09900-20701: Dial gauge chuck
09900-21304: V blocks
REASSEMBLY AND INSTALLATION
Reassembly and install the front wheel in the reverse order of
removal and disassembly. Pay attention to the following points:
WHEEL BEARING
• Apply grease to the wheel bearings.
99000-25010: SUZUKI SUPER GREASE “A”
or equivalent
The removed bearing must be replaced with a new one.
Содержание TU250X
Страница 1: ......
Страница 2: ......
Страница 41: ...PERIODIC MAINTENANCE 2 23...
Страница 213: ...EXHAUST SYSTEM 6 1 6 EXHAUST SYSTEM CONTENTS EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 4 INSTALLATION 6 4...
Страница 342: ...10 22 SERVICING INFORMATION SIDE STAND INSTALLATION 50 N m 5 0 kgf m 36 0 lbf ft 55 N m 5 5 kgf m 40 0 lbf ft...
Страница 369: ......
Страница 370: ......