
3-30 ENGINE
• Cool down the new valve guides in a freezer for about one
hour and heat the cylinder head to 100 – 150 °C (212 – 302
°F) with a hot plate.
• Apply engine oil to the valve guide hole.
• Drive the valve guide into the hole using the valve guide
installer.
NOTE:
Install the valve guide until the ring
A
contacts with the cylinder
head.
09916-44910: Valve guide installer & remover
• After installing the valve guides, re-finish their guiding bores
using the valve guide reamer.
• Clean and oil the valve guides after reaming.
09916-34542: Reamer handle
09916-34550: Valve guide reamer (5.5 mm)
NOTE:
* Be sure to cool down the cylinder head to ambient air temper-
ature.
* Insert the reamer from the combustion chamber and always
turn the reamer handle clockwise.
Do not use a burner to heat the valve guide hole to
prevent cylinder head distortion.
Replace the valve guide and ring with new ones.
Содержание TU250X
Страница 1: ......
Страница 2: ......
Страница 41: ...PERIODIC MAINTENANCE 2 23...
Страница 213: ...EXHAUST SYSTEM 6 1 6 EXHAUST SYSTEM CONTENTS EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 4 INSTALLATION 6 4...
Страница 342: ...10 22 SERVICING INFORMATION SIDE STAND INSTALLATION 50 N m 5 0 kgf m 36 0 lbf ft 55 N m 5 5 kgf m 40 0 lbf ft...
Страница 369: ......
Страница 370: ......