
ENGINE 3-63
• Install the gearshift shaft
9
.
NOTE:
Align the center teeth on the gearshift shaft with the center teeth
on the gearshift cam driven gear.
OIL PUMP
• Install the oil pump
1
with the oil pump mounting bolts and
then tighten them to the specified torque.
Oil pump mounting bolt: 10 N·m (1.0 kgf-m, 7.0 lbf-ft)
• Install the washer
2
and pin
3
.
• Install the oil pump driven gear
4
and snap ring
5
.
NOTE:
Align the groove
A
of oil pump driven gear
4
with the pin
3
.
09900-06107: Snap ring remover (Open type)
• Install the oil pump drive gear
6
and circlip
7
to the primary
driven gear assembly
8
.
Never reuse a snap ring.
Never reuse a circlip.
Содержание TU250X
Страница 1: ......
Страница 2: ......
Страница 41: ...PERIODIC MAINTENANCE 2 23...
Страница 213: ...EXHAUST SYSTEM 6 1 6 EXHAUST SYSTEM CONTENTS EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 4 INSTALLATION 6 4...
Страница 342: ...10 22 SERVICING INFORMATION SIDE STAND INSTALLATION 50 N m 5 0 kgf m 36 0 lbf ft 55 N m 5 5 kgf m 40 0 lbf ft...
Страница 369: ......
Страница 370: ......