Control Panel Installation
53722
4-3
4.3
Battery Connection
The control panel battery charge capacity is 17 to 55 AH. Use 12V batteries of the same AH
rating. Determine the correct AH rating as per your standby load calculation (see Section 3.6).
Wire batteries in series to produce a 24-volt equivalent. Do not parallel batteries to increase
the AH rating. It is recommended that you replace batteries every five years.
Figure 4-2 Battery Connection
To Control Panel
Red
Black
Battery Jumper
(P/N 140694)
Shipped With Panel
UL Recognized 12V Battery
UL Recognized 12V Battery
Содержание SCSS-700
Страница 2: ......
Страница 12: ...SCSS 700 Installation Manual 8...
Страница 22: ...Model SCSS 700 Installation Manual 1 10 53722...
Страница 26: ...Model SCSS 700 Installation Manual 2 4 53722...
Страница 31: ...Before You Begin Installing 53722 3 5 Figure 3 1 Wire Routing Example...
Страница 42: ...Model SCSS 700 Installation Manual 3 16 53722...
Страница 92: ...Model SCSS 700 Installation Manual 4 50 53722...
Страница 130: ...Model SCSS 700 Installation Manual 8 8 53722 Figure 8 4 Example of Zone Events Mapped to output Groups and Patterns...
Страница 131: ...Programming Overview 53722 8 9 Figure 8 5 Example of Zone Events Mapped to Output Groups and Patterns on a Single Panel...
Страница 134: ...Model SCSS 700 Installation Manual 8 12 53722 Figure 8 9 Example of SCSS 700PK Software mapping Site Events...
Страница 148: ...Model SCSS 700 Installation Manual 8 26 53722...
Страница 192: ...Model SCSS 700 Installation Manual 9 44 53722...
Страница 250: ...SCSS 700 Installation Manual A 14 53722...
Страница 254: ...Cut Along the Dotted Line...
Страница 256: ......
Страница 257: ......