
Commissioning
8.5 Commissioning with the STARTER commissioning tool
SINAMICS DCM DC Converter
318
Operating Instructions, 12/2018, A5E34763375A
Transferring a STARTER project to the drive unit
The following steps are required to transfer the STARTER project created offline to the drive
unit:
●
Step 1
Select the menu command Project > Connect to target system
Selection in the toolbar:
●
Step 2
Select DCM_ADVANCED_CUD as drive unit in the following screen and confirm with OK:
Figure 8-31 Target device selection
Содержание SINAMICS Series
Страница 1: ......
Страница 2: ......
Страница 744: ...Appendix A A 4 Servicing SINAMICS DCM DC Converter 742 Operating Instructions 12 2018 A5E34763375A ...
Страница 758: ......