![Siemens NXAIR Скачать руководство пользователя страница 346](http://html.mh-extra.com/html/siemens/nxair/nxair_operating-instructions-manual_380678346.webp)
Accessing the connection compartment through the front
346
NXAIR /
≤ 40 kA
110-0134.9 / 14
Perform final checks regarding the correct state and position of the shutter (1) and the
levers (2) for moving the shutter. If any of these checks fails, do
not
insert any removable
voltage transformers in the voltage transformer compartment, but inform the regional
Siemens representative.
Check against the labyrinth (3) if the shutter (1) is horizontally arranged.
Check if the top edge of the shutter is flush with the shutter frame (4).
Check if the levers (2) are in perfectly straight condition.
Fig. 643: Checking state and position of shutter and levers
(1) Shutter
(2) Lever
(3) Labyrinth
(4) Shutter frame
✓
The bushing plate, the vertical partition and the voltage transformer compartment are
installed.
INFORMATION
Final procedure steps
Now the panel can be integrated into the course of operation again, for example:
Inserting a withdrawable part / removable voltage transformers in the
panel.
Closing the high-voltage door / door to the voltage transformer
compartment.
De-earthing the feeder.
Racking the withdrawable part / removable voltage transformers to service
position.
1
2
2
3
4