Operating the metering panel
106
NXAIR /
≤ 40 kA
110-0134.9 / 14
Pull the upper end of the protection fuse-link off the clamp.
Pull the lower end of the protection fuse-link off the clamp and remove the protection fuse-
link.
Fig. 171: Pulling off the fuse-link
Push the lower end of the new protection fuse-link into the clamp.
Push the upper end of the new protection fuse-link into the clamp.
Perform replacement with all other fuse-links.
✓
The protection fuse-links have been replaced.
INFORMATION
Final procedure steps
Next, insert the withdrawable metering part / metering truck into the panel.
After closing the high-voltage door, the panel can be integrated into the
course of operation again.