Procedure
1.
Screw the analyzer on with the wall fastening screws.
2.
Screw on the sample gas line inlet.
Ensure gas tightness.
3.
Screw on the sample gas line outlet.
4.
Connect the signal lines according to the marking made. See enclosed wiring
diagram)
5.
Connect the power supply to the power supply unit with EMC glands.
10.10.9
Replacing the complete analyzer module
10.10.9.1
Remove the complete analyzer module
Overview
The complete analyzer module contains all measuring modules.
It is in the analyzer bottom part.
It can be removed complete with all modules.
1
Sample gas inlet (rear)
2
Sample gas outlet (front)
3
Complete analyzer module
10
MAINTENANCE
88
O P E R A T I N G I N S T R U C T I O N S | MARSIC280
8021339/1CHC/V1-1/2021-07 | SICK
Subject to change without notice