6.
Connect the PE line to connection terminal PE with ferrule.
7.
Remove the enclosed three-point jumper from the bag in the cable duct.
8.
Clamp the three-point jumper to contacts 2, 3 and 4.
9.
Clamp the two-point jumper to contacts 5 and 6.
5.5.5
Connecting the hose bundle line to gas sampling unit (230 V)
Overview
1
4
2
3
6
5
Figure 11: Standard hose bundle line
1
Power supply
2
Signal line
3
Grounding conductor
4
PTFE hose, white, DN4/6
5
PA hose, black, DN6/8, labeled "1"
6
PA hose, blue, DN6/8, labeled "2"
MOUNTING
5
8021339/1CHC/V1-1/2021-07 | SICK
O P E R A T I N G I N S T R U C T I O N S | MARSIC280
31
Subject to change without notice