6.
Provide strain relief for the heated sample gas line by tightening the cap nut.
7.
Connect the power supply of the heated sample gas line.
8.
Connect the Pt100 for the heated sample gas line.
9.
Close all cable ducts.
Related topics
•
Clamping ring screw connection:
see "Installing the stainless steel screw fitting",
•
Wiring diagram of the measuring device
5.5.10
Connecting the hose bundle line to the sample conditioning and distribution unit (two measuring
points)
Important information
NOTICE
Protect the line from damage (chafing through vibration, mechanical load).
NOTICE
During operation, condensate may form in the sample gas line.
b
Fit the sample gas line in a downward direction
Procedure
1.
Remove the protective cap from the glands for the heated sample gas lines on the
sample conditioning and distribution unit.
2.
Insert the heated sample gas line into the gland.
NOTICE
Pay attention to the sample gas line bending radius.
3.
Tighten the lock nut from the inside.
4.
Align the position and length of the heated sample gas lines.
5.
Connect the heated sample gas lines to the cooler inlet with the clamping ring
screw connection.
6.
Provide strain relief for the heated sample gas line by tightening the cap nut.
7.
Connect the power supply of the heated sample gas line.
8.
Connect the Pt100 for the heated sample gas line.
9.
Close all cable ducts.
Related topics
•
Clamping ring screw connection:
see "Installing the stainless steel screw fitting",
•
Wiring diagram of the measuring device
MOUNTING
5
8021339/1CHC/V1-1/2021-07 | SICK
O P E R A T I N G I N S T R U C T I O N S | MARSIC280
37
Subject to change without notice