5.5.6
Connecting the hose bundle line to the sample conditioning and distribution unit (one measuring
point)
Prerequisites
•
Cable ducts are open.
•
The hose bundle line is stripped 1,5 cm.
•
Strip 20 cm of insulation from the voltage and signal lines of the hose bundle line.
Procedure
1.
Insert the hose bundle line into the cable gland provided for this purpose. At the
same time, keep the ground wire in the top position.
2.
Connect the hoses of the hose bundle line to the valve block.
3.
Connect the power supply of the gas sampling unit using the 1.5 mm
2
wires with
ferrule.
4.
Connect the Pt100 of the gas sampling unit using the 1.0 mm
2
wires with ferrule.
5.
Connect the PE line to connection terminal PE with ferrule.
6.
Tighten the cable gland.
Related topics
•
Wiring diagram of the measuring device
5.5.7
Connecting the hose bundle line to the sample conditioning and distribution unit (two measuring
points)
Prerequisites
•
Cable ducts are open.
•
The hose bundle line is stripped 1,5 cm.
•
Strip 20 cm of insulation from the voltage and signal lines of the hose bundle line.
Procedure
1.
Insert the hose bundle line into the cable gland provided for this purpose. At the
same time, keep the ground wire in the top position.
2.
Connect the hoses of the hose bundle line to the valve block.
5
MOUNTING
34
O P E R A T I N G I N S T R U C T I O N S | MARSIC280
8021339/1CHC/V1-1/2021-07 | SICK
Subject to change without notice