8017035/ZMO9/2017-06-08 • © SICK AG • Subject to change without notice.
101
Functions
Reference: For details on the operation, see “9.4 Timing Charts.”
7.7.3
Span
Multiply the measured values of the area by the specified value.
Use this function to correct the installation tilt and in similar situations.
[Setting target:] Areas 1 to 4 and calculations 1 and 2
7.7.4
Calculation Formulas
You can perform calculations with the measured results of multiple areas.
Set up to two calculation formulas. The calculation formulas are defined as
shown below. Select from the following values for the calculation targets
and for the operator.
Calc target 1
Operator
Calc target 2
Area 1
Area 2
Area 3
Area 4
Area 1
Area 2
Area 3
Area 4
+
–
[Setting target:] Calculations 1 and 2
Calc target1 and Calc target2
Select the targets to use in the calculation. Select from areas 1 to 4.
Operator
Select the operator to place between the areas.
Actual calculation example
To perform measurements such as level difference measurements and
angle measurements, use the calculation settings.
To perform a level difference measurement, measure the heights of the
upper and lower surfaces of the level difference, and then subtract one
height from the other.