Section 4: Cable Carrier Installation • May 2, 2016
© Copyright 2016 ShopBot Tools, Inc.
page 4-3
Prepare the Cable Carriers
Before installation, check each cable carrier by bending it into
the installed position. Check end link orientation. Both end
links should face down as shown.
Reversing the End Links
If the end links are not in the correct orientation, insert a screw-
driver blade into the slot at the end of the link and twist until the
flange pops off the side lugs.
Reverse the end link as needed. Push the end link until the flang-
es snap into the side lugs.
Содержание PRSalpha
Страница 2: ...Assembly Guide for PRS Alpha and Standard Tools May 2 2016 Copyright 2016 ShopBot Tools Inc page 2 ...
Страница 10: ...Assembly Guide for PRS Alpha and Standard Tools May 2 2016 Copyright 2016 ShopBot Tools Inc page 10 ...
Страница 38: ...Section 3 Gantry Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 3 8 ...
Страница 49: ...Section 4 Cable Carrier Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 4 11 ...
Страница 50: ...Section 4 Cable Carrier Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 4 12 ...
Страница 56: ...Section 5 Control Box Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 5 6 ...
Страница 66: ...Section 6 Spindle and VFD Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 6 10 ...
Страница 78: ...Section 8 Wire and Cable Routing May 2 2016 Copyright 2016 ShopBot Tools Inc page 8 8 ...
Страница 80: ...Section 9 PRS Alpha Control Box Wiring May 2 2016 Copyright 2016 ShopBot Tools Inc page 9 2 ...
Страница 90: ...Section 10 PRS Alpha Control Box Wiring May 2 2016 Copyright 2016 ShopBot Tools Inc page 10 10 ...