![ShopBot PRSalpha Скачать руководство пользователя страница 47](http://html.mh-extra.com/html/shopbot/prsalpha/prsalpha_assembly-manual_1259418047.webp)
Section 4: Cable Carrier Installation • May 2, 2016
© Copyright 2016 ShopBot Tools, Inc.
page 4-9
Cable Carrier to Lower X Bracket
Open the first five access gates by inserting the tip of a
flathead screwdriver into either side of the hinged access
gate. Turn the screw driver approximately 1/4 turn in each
direction until the side of the access gate releases.
Attach that end of the cable carrier to the holes located 3 1/2”
(64mm) from the end of the trough and closest to the middle of the
machine.
Use flat head 10-32 screws, flat washer, lock washer and nuts to
attach the lower portion of the cable carrier to the trough.
Test Cable Carrier Mobility on Both Axes
Place the open access gates close to their clasps to keep them from snagging and breaking off while
testing the carrier mobility. Move the X-axis back and forth the full extent of travel. The cable carrier
should not feel as though it is binding or under tension. If need be, adjust the trough brackets slightly
along the table side (X-axis.) Finishing by tightening the 5/16 button head screws holding the brackets
to the table. The lower end plate on the Y-axis can also be adjusted slightly if the Y-axis binds.
Содержание PRSalpha
Страница 2: ...Assembly Guide for PRS Alpha and Standard Tools May 2 2016 Copyright 2016 ShopBot Tools Inc page 2 ...
Страница 10: ...Assembly Guide for PRS Alpha and Standard Tools May 2 2016 Copyright 2016 ShopBot Tools Inc page 10 ...
Страница 38: ...Section 3 Gantry Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 3 8 ...
Страница 49: ...Section 4 Cable Carrier Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 4 11 ...
Страница 50: ...Section 4 Cable Carrier Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 4 12 ...
Страница 56: ...Section 5 Control Box Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 5 6 ...
Страница 66: ...Section 6 Spindle and VFD Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 6 10 ...
Страница 78: ...Section 8 Wire and Cable Routing May 2 2016 Copyright 2016 ShopBot Tools Inc page 8 8 ...
Страница 80: ...Section 9 PRS Alpha Control Box Wiring May 2 2016 Copyright 2016 ShopBot Tools Inc page 9 2 ...
Страница 90: ...Section 10 PRS Alpha Control Box Wiring May 2 2016 Copyright 2016 ShopBot Tools Inc page 10 10 ...