Assembly Guide for PRS Alpha and Standard Tools • May 2, 2016
© Copyright 2016 ShopBot Tools, Inc.
page 4
Table of Contents (cont’d)
Y-Axis Cable Carrier ................................................................................................................... 4-4
Mount the Lower Y Bracket ........................................................................................................ 4-4
Install Upper Y-Chain Bracket .................................................................................................... 4-5
Mount Cable Carrier to Lower Y Bracket ................................................................................... 4-5
Mount Cable Carrier to Upper Y Bracket ................................................................................... 4-5
X-Axis Cable Carrier ................................................................................................................... 4-6
Install Trough Brackets for ShopBots with 6” Z’s ....................................................................... 4-6
Install the X-Axis Trough: 6” Z-Axis ............................................................................................ 4-7
Machines with 12” and 24” Z-Axis ............................................................................................. 4-7
Install the Upper X Cable Carrier Bracket .................................................................................. 4-8
Cable Carrier to Upper X Bracket ............................................................................................... 4-8
Cable Carrier to Lower X Bracket ............................................................................................... 4-9
Test Cable Carrier Mobility on Both Axes ................................................................................... 4-9
X-Axis Cable Carrier Configurations ......................................................................................... 4-10
Section 5. Control Box Installation ...................................................................................................... 5-1
Introduction ................................................................................................................................ 5-1
Hardware .................................................................................................................................... 5-2
Installation .................................................................................................................................. 5-4
Alternate Mounting for 12” and 24” Z-Axis Models ................................................................... 5-5
Section 6. VFD Installation and Spindle .............................................................................................. 6-1
Introduction ................................................................................................................................ 6-1
VFD Installation ........................................................................................................................... 6-1
Hardware .................................................................................................................................... 6-2
Determining the VFD Model ....................................................................................................... 6-2
Voltage Amperage ...................................................................................................................... 6-3
Mounting the 10” VFD ................................................................................................................ 6-3
Mounting the 16” VFD ................................................................................................................ 6-4
Spindle Installation ..................................................................................................................... 6-5
Hardware .................................................................................................................................... 6-5
Lower the Z-Axis Extrusion ........................................................................................................ 6-6
Spindle Mounting Plate .............................................................................................................. 6-6
Attach Spindle ............................................................................................................................ 6-7
Replace Stop Screw ................................................................................................................... 6-7
Section 6 Appendix: Table Leg Drawings ................................................................................... 6-8
6” Table Leg ....................................................................................................................... 6-8
12” Table Leg ..................................................................................................................... 6-9
Section 7. Mounting X- and Y-Axis Motors ......................................................................................... 7-1
Introduction ................................................................................................................................ 7-1
Hardware .................................................................................................................................... 7-2
Motors ........................................................................................................................................ 7-2
Mount Pinions to Motors ............................................................................................................ 7-2
Identify Motors............................................................................................................................ 7-3
Check Alignment of Pinions with Rack ...................................................................................... 7-3
Check Pinion/Rack Alignment .................................................................................................... 7-3
Adjust Pinions (If Required) ........................................................................................................ 7-3
Mounting Locations .................................................................................................................... 7-4
Содержание PRSalpha
Страница 2: ...Assembly Guide for PRS Alpha and Standard Tools May 2 2016 Copyright 2016 ShopBot Tools Inc page 2 ...
Страница 10: ...Assembly Guide for PRS Alpha and Standard Tools May 2 2016 Copyright 2016 ShopBot Tools Inc page 10 ...
Страница 38: ...Section 3 Gantry Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 3 8 ...
Страница 49: ...Section 4 Cable Carrier Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 4 11 ...
Страница 50: ...Section 4 Cable Carrier Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 4 12 ...
Страница 56: ...Section 5 Control Box Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 5 6 ...
Страница 66: ...Section 6 Spindle and VFD Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 6 10 ...
Страница 78: ...Section 8 Wire and Cable Routing May 2 2016 Copyright 2016 ShopBot Tools Inc page 8 8 ...
Страница 80: ...Section 9 PRS Alpha Control Box Wiring May 2 2016 Copyright 2016 ShopBot Tools Inc page 9 2 ...
Страница 90: ...Section 10 PRS Alpha Control Box Wiring May 2 2016 Copyright 2016 ShopBot Tools Inc page 10 10 ...