Section 3: Gantry Installation • May 2, 2016
© Copyright 2016 ShopBot Tools, Inc.
page 3-3
Install Gantry
Caution:
The gantry is approximately 200
pounds and awkwardly weighted. Two peo-
ple should be used to lift the gantry.
Note:
Ensure front rails are already tightened.
With the help of another person, lift the gantry
onto the rails.
The dual V wheels should ride on each rail as shown.
Adjust the Rails
Align the back rail by running the gantry up and down the length of
the rail while watching from above to make sure rail is centered in the
wheel. Starting at one end of the gantry, adjust, then tighten the rail as
the gantry is slid down the length.
Содержание PRSalpha
Страница 2: ...Assembly Guide for PRS Alpha and Standard Tools May 2 2016 Copyright 2016 ShopBot Tools Inc page 2 ...
Страница 10: ...Assembly Guide for PRS Alpha and Standard Tools May 2 2016 Copyright 2016 ShopBot Tools Inc page 10 ...
Страница 38: ...Section 3 Gantry Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 3 8 ...
Страница 49: ...Section 4 Cable Carrier Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 4 11 ...
Страница 50: ...Section 4 Cable Carrier Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 4 12 ...
Страница 56: ...Section 5 Control Box Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 5 6 ...
Страница 66: ...Section 6 Spindle and VFD Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 6 10 ...
Страница 78: ...Section 8 Wire and Cable Routing May 2 2016 Copyright 2016 ShopBot Tools Inc page 8 8 ...
Страница 80: ...Section 9 PRS Alpha Control Box Wiring May 2 2016 Copyright 2016 ShopBot Tools Inc page 9 2 ...
Страница 90: ...Section 10 PRS Alpha Control Box Wiring May 2 2016 Copyright 2016 ShopBot Tools Inc page 10 10 ...