![ShopBot PRSalpha Скачать руководство пользователя страница 71](http://html.mh-extra.com/html/shopbot/prsalpha/prsalpha_assembly-manual_1259418071.webp)
Section 8: Wire and Cable Routing • May 2, 2016
© Copyright 2016 ShopBot Tools, Inc.
page 8-1
Section 8. Wire and Cable Routing
Hardware
Part
Quantity
ShopBot part number
Notes
Cable tie brackets
6
003062
Proximity switch
2
002740
Proximity switch cable
2
002739
Z zero plate and wire kit
1
14524
Emergency stop button
1
002723
PRS Standard
E-stop
1
000777
PRS Alpha
Cable Routing Strategy
Cable and wire routing will generally follow these steps. Greater detail is provided after this overview:
Spindle Power Cable
•
Uncoil spindle power cable.
•
Run cable from VFD under table to X cable carrier.
•
Secure to one side of carrier so motor and signal cables can be run on other side of carrier.
•
Run cable to Y cable carrier.
•
Remain on opposite side of signal and motor wires.
•
Arch cable over top of YZ car and install on spindle.
•
Take up slack in cable moving from Y to X cable carriers and secure cable with zip ties.
Motors and Signal Cables
•
Install the source if it is not already installed.
•
Unroll cable to ensure even feeding and minimize coiling.
•
Secure cable with zip ties along the route to the proper location.
•
Route to first cable carrier (usually Y) and secure in place with two closed gates.
•
Route all applicable cables through Y cable carrier.
•
Relieve tension on Y cable carrier and secure wires at either end with zip ties.
•
Route bundle from Y cable carrier to X cable carrier.
•
Route other cables into X cable carrier (X motor cables, X prox switch, and emergency stop).
•
Secure cables between cable carriers with zip ties.
•
Organize and relieve tension on cables in X cable carrier and secure with zip ties.
•
Route cables under table.
Содержание PRSalpha
Страница 2: ...Assembly Guide for PRS Alpha and Standard Tools May 2 2016 Copyright 2016 ShopBot Tools Inc page 2 ...
Страница 10: ...Assembly Guide for PRS Alpha and Standard Tools May 2 2016 Copyright 2016 ShopBot Tools Inc page 10 ...
Страница 38: ...Section 3 Gantry Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 3 8 ...
Страница 49: ...Section 4 Cable Carrier Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 4 11 ...
Страница 50: ...Section 4 Cable Carrier Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 4 12 ...
Страница 56: ...Section 5 Control Box Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 5 6 ...
Страница 66: ...Section 6 Spindle and VFD Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 6 10 ...
Страница 78: ...Section 8 Wire and Cable Routing May 2 2016 Copyright 2016 ShopBot Tools Inc page 8 8 ...
Страница 80: ...Section 9 PRS Alpha Control Box Wiring May 2 2016 Copyright 2016 ShopBot Tools Inc page 9 2 ...
Страница 90: ...Section 10 PRS Alpha Control Box Wiring May 2 2016 Copyright 2016 ShopBot Tools Inc page 10 10 ...