![SCHUNK ORG 85 Скачать руководство пользователя страница 64](http://html1.mh-extra.com/html/schunk/org-85/org-85_assembly-and-operating-manual_1215965064.webp)
Function and handling
64
03.00 | ORG | Assembly and Operating Manual | en | 389246
Process step internal
assembly IM_1.7
The O-ring gripper remains at the assembly position to assemble
the seal. Triple jaw A remains closed. Triple jaw B remains open.
The Z-stroke is pulled axially to the back.
By moving back the Z-stroke, proximity switch S5 switch is no longer
dampened.
Process step internal
assembly IM_1.8
The O-ring gripper remains at the assembly position to assemble
the seal. Triple jaw A remains closed. Triple jaw B remains open.
The Z-stroke remains at the back for 0.1 seconds (time relay). After
0.1 seconds have lapsed, the Z-stroke is moved forward again.
Proximity switch S5 is dampened again by moving the Z-stroke
forward.
Process step internal
assembly IM_1.9
The O-ring gripper remains at the assembly position to assemble
the seal. The triple jaw A opens. Triple jaw B remains open. The Z-
stroke remains forward. Sensor S2 is not dampened since triple
jaw A moves against the wall of the bore and does not open
completely.
That is why a time relay of 0.1 seconds must be used in this case.
This means that triple jaw A opens and remains in the "OPEN"
position for 0.1 seconds.
Process step internal
assembly IM_1.10
The O-ring gripper remains at the assembly position to assemble
the seal. Triple jaw A and triple jaw B move together after 0.1
seconds (IM_9). The Z-stroke remains for-ward.
Proximity switches S1 and S3 are dampened again by closing
triples jaws A and B.
The internal assembly procedure is completed and a new cycle can
follow.