![SCHUNK ORG 85 Скачать руководство пользователя страница 77](http://html1.mh-extra.com/html/schunk/org-85/org-85_assembly-and-operating-manual_1215965077.webp)
Function and handling
03.00 | ORG | Assembly and Operating Manual | en | 389246
77
5.6.10 Internal assembly IM_1.10
Internal assembly IM_1.10
In the final step, the assembly fingers and the segment jaws are
moved toward the inside, i.e. the gripper, triple jaw A and triple
jaw B are closed (compressed air connection (1) pressurised,
compressed air connection (4) not pressurised).
The internal assembly cycle is completed and the gripper can
subsequently be moved out of the assembly bore.