![SCHUNK ORG 85 Скачать руководство пользователя страница 85](http://html1.mh-extra.com/html/schunk/org-85/org-85_assembly-and-operating-manual_1215965085.webp)
Maintenance
03.00 | ORG | Assembly and Operating Manual | en | 389246
85
Ø
By pressing the unit together, the transverse bore in the base
body triple jaw B (12) is concentric with the elongated hole in
the pressure pin (11).
Ø
You can detach the three cylindrical pins (13) connecting the
angle levers of triple jaw B (18) with the pressure pin (11) only
now.
Ø
Detach the three cylindrical pins (60) supporting the angle
levers of triple jaw B (18) in base body triple jaw A (12).
Ø
Pull the base jaws (16) radially out of the base body triple jaw B
(12). (Note: angle lever triple jaw B (18) must be turned into the
base jaw (16) for this purpose.)
Ø
Detach the three cylindrical pins (60) connecting the angle
levers of triple jaw B (18) with the base jaws (16).
Ø
Loosen the three screws (40) from the housing cover (2) and
pull it and the piston Z-stroke (3) toward the back out of the
housing (1).
Ø
Detach the six cylindrical pins (62) from the housing (1).
NOTE
Assembly is carried out in reverse order whereby the following
notes need to be observed for the assembly of assembly group 2:
Ø
Observe notes in this chapter
79], the necessary
utensils for maintenance
Utensils required for maintenance
79] as well as the screw
tightening torques
Ø
The three cylindrical pins (13) must be pressed into the centre
of the angle lever triple jaw B (18) with an assembly rod, see
Figure 49.Please observe the exact assembly dimension and the
exact assembly position of the cylindrical pins (13).