
- 20 -
3-4 Removal and Installation of the Operation Panel
3-4
Removal and Installation of the Operation Panel
3-4-1
Removal of Operation Panel
Hook
①
and
②
on the cover with your fingers, and take off the panel, pull it toward you while pressing the
jack catch on
②
side.
Figure 3-11 Removal of Operation Panel
3-4-2
Installation of Operation Panel
When installing, simply insert the operation panel straightly.
At this point, check from front cover, if the operation panel is not protruding, it is fully installed.
Otherwise, protruding operation panel may result in unreliable contact of connector.
●
If the removed operation panel is installed outside the control cabinet, please use a 8-pin direct plug-in
combination cable (both ends of RJ45 type) which is shielded within 5m and available from market for
connection.
See [5-6 Connecting Operation
Panel with Extension Cable] for
connectionmethod.
See [12-2 Operation Panel]
forinstallation opening.
Figure 3-12 Installation of Operation Panel outside Cabinet
Содержание Samco SVC06
Страница 1: ...High Performance Vector Control Inverter Instruction Manual Basic SANKEN ELECTRIC CO LTD...
Страница 2: ......
Страница 133: ...Memorandum...
Страница 134: ...Memorandum...
Страница 135: ......