②
Collimate the prism center,
press [F2] ([DIST]) to start
measurement, the screen will
display longitude, latitude and
the height difference between
the target point and line.
Meanwhile, the graphic on the
right of the screen displays the
relation among the prism,
station and the line.
[F2]
【
AS-BuiltCheck
】
PtID
:
3
R.HT
:
1.500
m
Ln
:
2.259 m
Of
:
-0.257 m
H
:
1.305 m
All DIST STAKE
↓
DIST RECORD ShiftL
∣←
③
P
measurement of
other points in the same
approach.
【
AS-BuiltCheck
】
PtID
:
--- ---
Ln
:
---.--- m
R.HT
:
1.500
m
Of
:
---.--- m
H
:
---.--- m
roceed the
All DIST STAKE
↓
DIST RECORD ShiftL
∣←
Information shown in AS-Builtcheck is introduced follow:
Longitude (in direction of the line) is positive: expresses the point measured lies between the start
point and end point of the line.
Right latitude offset is positive: expresses the point measured is on the right of the line.
H is
: expresses the point measured is higher than the start point of the line.
positive
The height of start point of t
ays set as the ref
ht .
S
[
switches to Stake Out function .
[
: Input a shift value to shift the line horizontally.
5.14.4 Stake Out
r points to be sta
e.
OPERATION
DISPLAY
he line is alw
erence heig
oft Keys:
F3]( [STAKE]): The program
F3]([ShiftL])
Here you can search of ente
OPERATIONAL STEPS
ked out related to the measured lin
①
In
【
AS-BuiltCheck
】
menu,
press [F3] ([STAKE]) to enter
into Stake Out function.
※
1)
【
Stake Out
】
---.--- m
---°---
′
---
″
PtID
:
--- ---
R.HT
:
1.500 m
Of
:
---.--- m
H
:
--- --- m
Ln
:
---.---
m
All DIST STAKE
↓
---.--- m
DIST RECORD SHIFTL
∣←
159
Содержание STS-750
Страница 6: ...6...