②
Press navagation key
to
move to R.HT item and input
the prism height.
Input prism
height
【
Stake Out
】
2/3
▼
PtID
:
6
Type
:
Meas.
R.HT
:
2.000 m
△
L Off
:
﹉
.
﹉
m
△
T Off:
﹉
.
﹉
m
Ⅰ
△
H
:
﹉
.
﹉
m
All DIST RECORD
↓
③
Collimate one the prism,
press [F2] ([DIST]) to start
measurement and calculate the
stake-out factor offset between
the station point and stake-ou
point.
[F2]
【
Stake Out
】
2/3
▼
PtID
:
6
Type
:
Meas.
R.HT
:
1.800 m
△
L Off
:
4.086 m
△
T Off: -2.361m
Ⅰ
△
H
:
1.302 m
All DIST RECORD
↓
④
Move the prism northing or
southing according to the
arrowhead until the
△
Lon
m.
·
Arrowhead means
:
gitudinal offset displays 0
: Southing the prism to the
station
: Northing the prism to the
station.
Stake Out program, if “Fine
[r]” or “Tracking” is selected,
then the factor difference
between prism point and
stake-out point can b
In
e
isplayed immediately, which
is quite convenient.
【
Stake Out
】
2/3
▼
PtID
:
6
d
Type
:
Meas.
R.HT
:
1.800 m
△
L Off
:
0.000 m
△
T Off: -1.026 m
Ⅰ
△
H
:
0.802 m
All DIST RECORD
↓
⑤
Rotate the telescope until the
△
Transversal offset displays 0
m, and notify the surveyor to
move the prism.
·
Arrowhead means
:
:
Westing the prism to the
station.
:
Easting the prism to the
station.
【
Stake Out
】
2/3
▼
PtID
:
6
Type
:
Meas.
R.HT
:
1. 00 m
8
△
L Off
:
0.000 m
△
T Off: 0.000 m
Ⅰ
△
H
:
0.822 m
All DIST RECORD
↓
79
Содержание STS-750
Страница 6: ...6...