⑥
When both
△
L Off and
△
T Off display 0 m, it implies
that the current prism point is
the stake-out point.
△
H means the fill/dig data.
: to dig. The value is the
depth to dig.
:
to fill. The Value is the
height to fill.
【
Stake Out
】
2/3
▼
PtID
:
6
Type
:
Meas.
R.HT
:
2.000 m
△
L Off
:
0 .000 m
△
T Off: 0 .000 m
Ⅰ
△
H
:
0.822 m
All DIST RECORD
↓
Stake-out of point is finished.
Press navigation key
【
Stake Out
】
2/3
▼
PtID
:
7
to select the next point to
be staked out. (Or call up the
existed PtID in the job via Pt
Search function.)
Type
:
Known
R.HT
:
2.000 m
f
△
L O f
:
﹉
.
﹉
m
Ⅰ
△
:
△
T Off:
﹉
.
﹉
m
H
﹉
.
﹉
m
All DIST RECORD
↓
5
e Out
oordinate system and the offset is divided into a north and east
e
.6.4 Coordinate Offset Stak
Stake out is based on a c
lement.
1
:
Actual 2
:
Point to be staked out
Meaning of several offsets in process of coordinate stake-out.
Offset of X coordinate between stake-out point and current measurement point.
△
X/
△
E:
△
Y/
△
N: Offset of Y coordinate between stake-out point and current measurement point.
80
Содержание STS-750
Страница 6: ...6...