Queensland Urban Utilities
Rosewood Sewage Treatment Plant
Contract No. I112-025
A084 OM Manual.docx
Revision A
25-Mar-13 Page 2
Table of Contents
Volume 1.
INTRODUCTION, SYSTEM OVERVIEW, FUNCTIONAL SPEC, DESIGN
5
1.1
INTRODUCTION & SYSTEM OVERVIEW
5
1.2
LOCATION DETAILS & MAP
5
1.3
DESCRIPTION OF EQUIPMENT & PROCESS
6
1.3.1
INLET WORKS
6
1.3.2
FLOW SPLITTER
6
1.3.3
SBR – SEQUENCING BATCH REACTOR
7
1.3.4
RETURN ACTIVATED SLUDGE (RAS) PUMP STATION
7
1.3.5
CHLORINE CONTACT TANK
8
1.3.6
WASTE ACTIVATED SLUDGE (WAS) PUMP STATION
8
1.3.7
SLUDGE THICKENER
8
1.3.8
CHLORINE STORAGE AND DOSING AREA
8
1.3.9
POLYELECTROLYTE STORAGE AND DOSING AREA
9
1.4
OPERATIONAL MODES
9
Volume 2.
PROPRIETARY EQUIPMENT MANUALS, MAINTENANCE SERVICE, DATA
SHEETS
10
2.1
PROPRIETARY EQUIPMENT MANUALS
10
2.1.1
POLYMER DOSING SKID (GRUNDFOS)
10
2.1.2
SODIUM HYPOCHLORITE DOSING SKID (GRUNDFOS)
10
2.1.3
SCREEN EXTRACTOR (CST WASTEWATER SOLUTIONS)
10
2.1.4
LD300 LINEAR DECANTER (PROWATER)
10
2.1.5
MECHANICAL EQUIPMENT
10
2.1.6
ELECTRICAL EQUIPMENT
11
2.2
OPERATIONAL PROCEDURES
12
2.2.1
INLET WORKS
12
2.2.2
FLOW SPLITTER
12
2.2.3
SEQUENCING BATCH REACTOR (SBR)
13
2.2.4
RETURN ACTIVATED SLUDGE (RAS) PUMP STATION
15
2.2.5
CHLORINE CONTACT TANK (CCT)
15
2.2.6
WASTE ACTIVATED SLUDGE (WAS) PUMP STATION AND SLUDGE
THICKENER
16
2.2.7
CHLORINE STORAGE AND DOSING AREA
18
2.2.8
POLYELECTROLYTE STORAGE AND DOSING AREA
18
2.3
FAULT PROTECTION & RECTIFICATION
20
2.3.1
INLET WORKS
20
2.3.2
FLOW SPLITTER
20
2.3.3
SEQUENCING BATCH REACTOR (SBR)
21
2.3.4
RETURN ACTIVATED SLUDGE (RAS) PUMP STATION
22
2.3.5
CHLORINE CONTACT TANK (CCT)
22
Rosewood STP ST42 General (Operation and Maintenance Manual - Part 4:
Section 6.3 Manufacturers Manuals 6.3.33 Danfoss VLT Aquadrive 8000) Vendor Manual
QP Id: VM207
Active: 03/09/2013
Page 2 of 208