2.3.6
WASTE ACTIVATED SLUDGE (WAS) PUMP STATION AND SLUDGE
THICKENER
22
2.3.7
CHLORINE STORAGE AND DOSING AREA
23
2.3.8
POLYELECTROLYTE STORAGE AND DOSING AREA
23
2.4
START-UP & SHUT-DOWN PROCEDURES
24
2.5
ISOLATION & RESTORATION PROCEDURES
24
2.6
MAINTENANCE SCHEDULE
24
2.7
lIST OF SUB-CONTRACTORS & PROPRIETARY EQUIPMENT
37
2.8
RECOMMENDED SPARE PARTS & SPECIAL TOOLS
38
2.9
LIST OF MANUFACTURER & SUPPLIER DETAILS
41
Volume 3.
DRAWINGS, DRAWING REGISTER, UNDERGROUND CABLE ROUTING
DETAILS
43
3.1
DRAWINGS REGISTER
43
3.2
‘AS-CONSTRUCTED’ DRAWINGS
43
3.3
UNDERGROUND CABLE ROUTING DETAILS
43
Volume 4.
INSTALLATION, PRE-COMMISSIONING, COMMISSIONING, SYSTEM
TESTING, TRAINING, METHOD STATEMENTS, Q.A.
144
4.1
COMMISSIONING PLAN
144
4.2
SITE ACCEPTANCE TESTING DOCUMENTATION
707
Volume 5.
DESIGN REPORTS, APPROPRIATE RECORDS & APPENDICES
1079
5.1
DESIGN DETAILS
1079
5.2
DESIGN CRITERIA
1079
5.3
PROCESS DESIGN DESCRIPTION
1079
Volume 6.
APPENDICES
1080
6.1
APPENDIX A - LOT REGISTER
1080
6.2
NOT USED
1086
6.3
APPENDIX C – MANUFACTURER O&M MANUALS
1087
Rosewood STP ST42 General (Operation and Maintenance Manual - Part 4:
Section 6.3 Manufacturers Manuals 6.3.33 Danfoss VLT Aquadrive 8000) Vendor Manual
QP Id: VM207
Active: 03/09/2013
Page 3 of 208