Rite‑Hite
®
Installation/Service/Owner's Manual
FasTrax
®
XL
Publication:
AMEN00316 2020-07-06
65
MAINTENANCE
Drive Sphere Replacement
1 Apply adhesive* to curtain edge drive sphere stud
before pushing through curtain and add more
adhesive to stud before tightening Adhesive must
ooze out both sides after stud is tightened
2 Stud must be tightened prior to adhesive starting to
dry. Adhesive dry time is ≈ 1 minute.
Torque spec: 16in-lbs ± 4in-lbs [1.4Nm ± .45Nm].
* Recommended adhesive for thread locking and securing
drive sphere to the edging:
Loctite
®
438 or 3M-DP8005 (supplied by others)
Retention Strip Replacement
B
D
C
A
E
1 Turn power off and follow
2 Remove lower re-feed roller (E)
3 Remove screws (C) holding retention strip with
J-Strip (D) in place and slide strip out through the top
of the lower track (B)
4 Slide new retention strip into lower track
NOTE:
Per the top view (A), orient the longer leg of
the "J" toward the lower track and the groove away
from the lower track
5 Fasten strip with screws at the bottom of lower track
DO NOT
screw strip to lower track, other than at
the bottom
Figure 83
Figure 84
Содержание FasTrax XL
Страница 9: ...Rite Hite Installation Service Owner s Manual FasTrax XL Publication AMEN00316 2020 07 06 9...
Страница 89: ...Rite Hite Installation Service Owner s Manual FasTrax XL Publication AMEN00316 2020 07 06 89...
Страница 90: ...FasTrax XL Installation Service Owner s Manual Rite Hite 90 Publication AMEN00316 2020 07 06...
Страница 91: ...Rite Hite Installation Service Owner s Manual FasTrax XL Publication AMEN00316 2020 07 06 91...