FasTrax
®
XL
Installation/Service/Owner's Manual
Rite‑Hite
®
22
Publication:
AMEN00316 2020-07-06
INSTALLATION
Rear Brace/Primary Tube
DANGER
Use a lift with lifting capacity sufficient for lifting
the weight of the unit. The load must also be
securely fastened to the lifting device.
Utiliser un chariot élévateur ayant une capacité
suffisante pour soulever le poids de l'unité. La
charge doit être solidement fixée au dispositif de
levage.
A
B
C
D
E
Standard Projection
For Extended Projection go to
1 Install the top rear brace (A) on the header plates,
using 6 (3 each side) 3/8in-16 x 1 1/4in [M10 x 32mm]
hex head machine screws (B) and 3/8in-16 [M10]
nylock nuts (C)
NOTE:
1 3/4in [44mm] hex head machine screws (B)
are used for extended projection flat/no shroud.
2 Secure the header plates to the wall using through
bolts, washers (D), and nuts (E) (fasteners supplied
by others)
3 Place a 6ft [2m] level on the rear brace to verify
level to ± 1/4in [6mm] If not, shim the lower track
as needed
NOTE:
The header plates
MUST BE
through bolted to
the wall a minimum of 2 places The remaining 3 positions
may be anchored
Go to
Figure 29
Содержание FasTrax XL
Страница 9: ...Rite Hite Installation Service Owner s Manual FasTrax XL Publication AMEN00316 2020 07 06 9...
Страница 89: ...Rite Hite Installation Service Owner s Manual FasTrax XL Publication AMEN00316 2020 07 06 89...
Страница 90: ...FasTrax XL Installation Service Owner s Manual Rite Hite 90 Publication AMEN00316 2020 07 06...
Страница 91: ...Rite Hite Installation Service Owner s Manual FasTrax XL Publication AMEN00316 2020 07 06 91...