
8 14x 3 ACS
• These counters count jobs, not pages.
• The jobs are counted even though the arrival and reception of the jobs at the Scan Router server
cannot be confirmed.
• If even one color image is mixed with black-and-white images, then the job is counted as a “Color”
job.
• If the job is cancelled during scanning, or if the job is cancelled while the document is waiting to be
delivered, the job is not counted.
• If the job is cancelled during sending, it may or may not be counted, depending on what stage of the
process had been reached when the job was cancelled.
• Even if several files are combined for sending, the transmission counts as one job.
8 151
T:Deliv Jobs/PC
*CTL
[0 to 9999999/ 0 / 1]
These SPs count the total number of jobs (color or black-and-white) scanned and sent
to a folder on a PC (Scan-to-PC).
Note: At the present time, 8 151 and 8 155 perform identical counts.
8 155
S:Deliv Jobs/PC
*CTL
[0 to 9999999/ 0 / 1]
These SPs count the total number of jobs (color or black-and-white) scanned and sent
with Scan-to-PC.
8 15x 1 B/W
8 15x 2 Color
8 15x 3 ACS
• These counters count jobs, not pages.
• If the job is cancelled during scanning, it is not counted.
• If the job is cancelled while it is waiting to be sent, the job is not counted.
• If the job is cancelled during sending, it may or may not be counted, depending on what stage of the
process had been reached when the job was cancelled.
• Even if several files are combined for sending, the transmission counts as one job.
System Service Mode
429
8
Содержание MPC 2800 AT-C2
Страница 1: ...Model AT C2 Machine Code D023 D025 Field Service Manual July 2008 Subject to change...
Страница 2: ......
Страница 16: ...Overview Component Layout 1 Product Information 14 1...
Страница 125: ...6 Attach the on standby decal O to the right hand side of the main power switch Anti Condensation Heater Type A 123 2...
Страница 152: ...2 Installation 150 2...
Страница 156: ...3 Preventive Maintenance 154 3...
Страница 171: ...Left Cover 1 Left cover A x 6 Rear Cover 1 Rear cover A x 8 Exterior Covers 169 4...
Страница 176: ...3 Ozone filters A in the right top cover 4 Replacement and Adjustment 174 4...
Страница 243: ...3 Toner transport motor A x 3 x 1 Toner Collection Unit 1 Gear Unit p 228 Drive Unit 241 4...
Страница 249: ...6 Development clutch K A x 1 Drive Unit 247 4...
Страница 265: ...8 Thermopile F x 2 x 1 Fusing 263 4...
Страница 272: ...3 Open the duplex door A 4 Right door cover B x 4 5 Right door rear cover A x 3 4 Replacement and Adjustment 270 4...
Страница 286: ...Behind the IOB FCU and G3 Interface Unit F BICU G Controller Board H HDD 4 Replacement and Adjustment 284 4...
Страница 287: ...Controller Box Open I ITB Power Supply Board Electrical Components 285 4...
Страница 327: ...Controller Self Diagnostics 325 5...
Страница 347: ...6 Troubleshooting Service Call Conditions See Appendices for the following information SC Tables 345 6...
Страница 354: ...MEMO 352...
Страница 355: ...Model AT C2 Machine Code D023 D025 Appendices July 2008 Subject to change...
Страница 356: ......
Страница 359: ...SP1 xxx System and Others 496 SP2 XXX Scanning image quality 496 3...
Страница 360: ...4...
Страница 396: ...2 Appendix Maintenance Tables 40 2...
Страница 474: ...4 Appendix Process Control Error Conditions 118 4...
Страница 476: ...5 Appendix Troubleshooting Guide 120 5...
Страница 484: ...5 Appendix Troubleshooting Guide 128 5...
Страница 492: ...Sensor Locations 6 Appendix Jam Detection 136 6...
Страница 500: ...7 Appendix Electrical Component Defects 144 7...
Страница 854: ...MEMO 498...
Страница 855: ...MEMO 499...
Страница 856: ...MEMO 500 EN...