
001 Fusing: Center
-
[–20 to 250 / 0 / 1 deg/step]
The heating roller has two lamps. One heats the
center of the heating roller and the other heats both
ends of the heating roller.
002 Fusing: Ends
-
[–10 to 250 / 0 / 1 deg/step]
The heating roller has two lamps. One heat s the
center of the heating roller and the other heats both
ends of the heating roller.
003 Pressure
-
1108
[Forced Ready Setting]
Japan use only
007 Time
*ENG
[22 to 60 / 22 / 0.1 sec/step]
1109
[Fusing Nip Band Check]
001
Execute
-
[0 or 1 / 0 / 1]
Executes the nip band measurement between
fusing belt and pressure roller.
If the nip band width is not 8 mm, and fusing is
not good, replace the pressure roller or install a
new fusing unit.
002
Pre-Idling Time
*ENG
[0 to 120 / 0 / 1 sec/step]
Specifies the fusing rotation time before executing SP1109-001.
003
Stop Time
* ENG
[5 to 30 / 10 / 1 sec/step]
Specifies the time for measuring the nip.
1112
[Environmental Correction: Fusing]
001
Temp.: Threshold: Low
*ENG
[10 to 23 / 17 / 1 deg/step]
Specifies the threshold temperature for low temperature condition.
002
Temp.: Threshold: High
*ENG
[24 to 40 / 30 / 1 deg/step]
Specifies the threshold temperature for high temperature condition.
8. Appendix: SP Mode Tables
156
8
Содержание MPC 2800 AT-C2
Страница 1: ...Model AT C2 Machine Code D023 D025 Field Service Manual July 2008 Subject to change...
Страница 2: ......
Страница 16: ...Overview Component Layout 1 Product Information 14 1...
Страница 125: ...6 Attach the on standby decal O to the right hand side of the main power switch Anti Condensation Heater Type A 123 2...
Страница 152: ...2 Installation 150 2...
Страница 156: ...3 Preventive Maintenance 154 3...
Страница 171: ...Left Cover 1 Left cover A x 6 Rear Cover 1 Rear cover A x 8 Exterior Covers 169 4...
Страница 176: ...3 Ozone filters A in the right top cover 4 Replacement and Adjustment 174 4...
Страница 243: ...3 Toner transport motor A x 3 x 1 Toner Collection Unit 1 Gear Unit p 228 Drive Unit 241 4...
Страница 249: ...6 Development clutch K A x 1 Drive Unit 247 4...
Страница 265: ...8 Thermopile F x 2 x 1 Fusing 263 4...
Страница 272: ...3 Open the duplex door A 4 Right door cover B x 4 5 Right door rear cover A x 3 4 Replacement and Adjustment 270 4...
Страница 286: ...Behind the IOB FCU and G3 Interface Unit F BICU G Controller Board H HDD 4 Replacement and Adjustment 284 4...
Страница 287: ...Controller Box Open I ITB Power Supply Board Electrical Components 285 4...
Страница 327: ...Controller Self Diagnostics 325 5...
Страница 347: ...6 Troubleshooting Service Call Conditions See Appendices for the following information SC Tables 345 6...
Страница 354: ...MEMO 352...
Страница 355: ...Model AT C2 Machine Code D023 D025 Appendices July 2008 Subject to change...
Страница 356: ......
Страница 359: ...SP1 xxx System and Others 496 SP2 XXX Scanning image quality 496 3...
Страница 360: ...4...
Страница 396: ...2 Appendix Maintenance Tables 40 2...
Страница 474: ...4 Appendix Process Control Error Conditions 118 4...
Страница 476: ...5 Appendix Troubleshooting Guide 120 5...
Страница 484: ...5 Appendix Troubleshooting Guide 128 5...
Страница 492: ...Sensor Locations 6 Appendix Jam Detection 136 6...
Страница 500: ...7 Appendix Electrical Component Defects 144 7...
Страница 854: ...MEMO 498...
Страница 855: ...MEMO 499...
Страница 856: ...MEMO 500 EN...