
022 Correction Environmental Correction: High *ENG
[-100 to 100 / 0 / 1 %]
023 Initial Correction: Center
*ENG
024 Initial Correction: Ends
*ENG
025 Correction Interval Initial Correction
*ENG
[0 to 60 / 0 / 1 sec]
034 1bin: Plain: Center
*ENG
[0 to 100 / 30 / 1 %]
035 1bin: Plain: Ends
*ENG
[FF Limit Temp]
026 Offset: Center
*ENG
[0 to 50 / 25 / 1 deg]
027 Offset: Ends
*ENG
[FF Start Time]
028 F Gate Timer: FC: Full
*ENG
[0 to 10000 / 2100 / 1mm/sec]
029 F Gate Timer: FC: Half
*ENG
[0 to 10000 / 4000 / 1mm/sec]
030 F Gate Timer: BW: Full
*ENG
[0 to 10000 / 0 / 1mm/sec]
031 F Gate Timer: BW Half
*ENG
[0 to 10000 / 500 / 1mm/sec]
[FF Correction Time]
032 Error Correction: Full
*ENG
[-5000 to 5000 / 0 / 1mm/sec]
033 Error Correction: Half
*ENG
1120
[Continues Print Mode Switch]
001
Paper Feed Condition
*ENG
[0 or 2 / 0 / 1]
Selects the paper feed timing.
0: Productivity priority, 1: Fusing quality priory
1159
[Fusing Jam Detection]
001
SC Display
*ENG
[0 or 1 / 0 / 1]
Enables or disables the fusing consecutive jam (three times) SC detection.
0: No detection, 1: Detection
8. Appendix: SP Mode Tables
162
8
Содержание MPC 2800 AT-C2
Страница 1: ...Model AT C2 Machine Code D023 D025 Field Service Manual July 2008 Subject to change...
Страница 2: ......
Страница 16: ...Overview Component Layout 1 Product Information 14 1...
Страница 125: ...6 Attach the on standby decal O to the right hand side of the main power switch Anti Condensation Heater Type A 123 2...
Страница 152: ...2 Installation 150 2...
Страница 156: ...3 Preventive Maintenance 154 3...
Страница 171: ...Left Cover 1 Left cover A x 6 Rear Cover 1 Rear cover A x 8 Exterior Covers 169 4...
Страница 176: ...3 Ozone filters A in the right top cover 4 Replacement and Adjustment 174 4...
Страница 243: ...3 Toner transport motor A x 3 x 1 Toner Collection Unit 1 Gear Unit p 228 Drive Unit 241 4...
Страница 249: ...6 Development clutch K A x 1 Drive Unit 247 4...
Страница 265: ...8 Thermopile F x 2 x 1 Fusing 263 4...
Страница 272: ...3 Open the duplex door A 4 Right door cover B x 4 5 Right door rear cover A x 3 4 Replacement and Adjustment 270 4...
Страница 286: ...Behind the IOB FCU and G3 Interface Unit F BICU G Controller Board H HDD 4 Replacement and Adjustment 284 4...
Страница 287: ...Controller Box Open I ITB Power Supply Board Electrical Components 285 4...
Страница 327: ...Controller Self Diagnostics 325 5...
Страница 347: ...6 Troubleshooting Service Call Conditions See Appendices for the following information SC Tables 345 6...
Страница 354: ...MEMO 352...
Страница 355: ...Model AT C2 Machine Code D023 D025 Appendices July 2008 Subject to change...
Страница 356: ......
Страница 359: ...SP1 xxx System and Others 496 SP2 XXX Scanning image quality 496 3...
Страница 360: ...4...
Страница 396: ...2 Appendix Maintenance Tables 40 2...
Страница 474: ...4 Appendix Process Control Error Conditions 118 4...
Страница 476: ...5 Appendix Troubleshooting Guide 120 5...
Страница 484: ...5 Appendix Troubleshooting Guide 128 5...
Страница 492: ...Sensor Locations 6 Appendix Jam Detection 136 6...
Страница 500: ...7 Appendix Electrical Component Defects 144 7...
Страница 854: ...MEMO 498...
Страница 855: ...MEMO 499...
Страница 856: ...MEMO 500 EN...