09/01/2014
00-14
S-7S ASSEMBLY FLOW CHART – GENERAL
For a general overview refer to the following chart. For more detailed information refer to
ASSEMBLY FLOW CHARTS – DETAILED.
Note:
The headings in the general chart
refer to headings in the detailed flow charts.
S-7S FUSELAGE
PRE-COVERING ASSEMBLY
S-7S TAIL SURFACES
PRE-COVERING ASSEMBLY
S-7S TAIL SURFACES
FINAL ASSEMBLY &
INSTALLATION
S-7S WINGS
PRE-COVERING ASSEMBLY
S-7S WINGS
FINAL ASSEMBLY &
INSTALLATION
S-7S FUSELAGE
FINAL ASSEMBLY
Содержание S-7S COURIER
Страница 26: ...RIVETS CROSS REFERENCE LIST...
Страница 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Страница 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Страница 119: ...09 01 2014 06 05 36 Check that the panel clears the fuselage frame to avoid vibration transmitted directly to the panel...
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 157: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......