09/01/2014
01A-03
13.
Apply Thread Sealant to the threads of the brake fitting and install the fitting into
the caliper. The fitting should face upward.
FINAL ASSEMBLY
14.
Install D-Cell Rubber Seal to bottom side of Station 2 crossing tube to help seal
against Gear Legs and Boot Cowl.
NOTE: Install D-Cell to inboard side of Top
Clamp Plate. Do NOT place between Clamp Plate and Fuselage.
15.
Install Main Gear to Fuselage
16.
During Final Assembly, route the brake lines from the Fuselage and down the
Gear Leg, to the Brake Assembly.
NOTE: The brake line will press into the
groove machined into the aft side of the Gear Leg.
Содержание S-7S COURIER
Страница 26: ...RIVETS CROSS REFERENCE LIST...
Страница 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Страница 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Страница 119: ...09 01 2014 06 05 36 Check that the panel clears the fuselage frame to avoid vibration transmitted directly to the panel...
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 157: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......